| # | Date Created | Employee | Work Type | Task | Duration (Hours) | Action |
|---|---|---|---|---|---|---|
| 1 | 2025-10-27 18:30 | Pranav Chandrakant Jagajampi | Leave or Permission | Took a leave for Diwali holidays |
27.00 | |
| 2 | 2025-09-25 21:09 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | MAHINDRA gate pass renewal procedure done |
7.00 | |
| 3 | 2025-09-19 21:13 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | IPMB power mode changed from ultra capacitor to battery mode with the help of the US team |
4.00 | |
| 4 | 2025-09-17 18:06 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | Gate pass renewal is in progress. |
3.00 | |
| 5 | 2025-09-16 18:47 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. 9 IPMB and Q7 separated.2. List prepared for 11 IPMB in an EXCEL sheet. |
8.00 | |
| 6 | 2025-09-15 21:27 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. Checked IPMB from the ultra capacitor to the battery mode.2. Regarding OBD cable PO checked with sameer3. Option type updated for W601 |
9.00 | |
| 7 | 2025-09-09 21:10 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. ATP sign-off sheet updated2. Internal online training completed |
9.00 | |
| 8 | 2025-07-21 18:39 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. After market tool VCI Garage Pro through took trials on Sai Baba TVS2. VCI assembled in MAHLE warehouse |
9.00 | |
| 9 | 2025-07-09 19:24 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | The IT policy has been updated for MAHLE POWERTRAIN LLC folder |
1.00 | |
| 10 | 2025-07-08 21:36 | Pranav Chandrakant Jagajampi | Inter-team Meetings | 1. Internal meeting with MSSI2. After-market tool testing discussion3. DL3 part related discussion4. PO follow up |
9.00 | |
| 11 | 2025-07-03 19:14 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | OS upgradation activity we have done. |
9.00 | |
| 12 | 2025-06-20 17:23 | Pravin Lonkar | Client (External) Meetings | Requirement discussion for BMS Flashing sequence modifications and support for modifications. |
3.00 | |
| 13 | 2025-06-19 22:21 | Pranav Chandrakant Jagajampi | Leave or Permission | Due to medical emergency took leave |
9.00 | |
| 14 | 2025-06-02 19:36 | Pravin Lonkar | Leave or Permission | On Leave |
8.00 | |
| 15 | 2025-06-02 09:10 | Pravin Lonkar | Project Documentation | Studied the revised requirement for N600 project, Prepared work efforts estimation. |
7.00 | |
| 16 | 2025-05-27 18:44 | Pranav Chandrakant Jagajampi | Inter-team Meetings | 1. DL3 Part related discussion |
5.00 | |
| 17 | 2025-05-12 09:57 | Pravin Lonkar | Leave or Permission | Personal Leave |
9.00 | |
| 18 | 2025-05-08 16:00 | Pravin Lonkar | Client (External) Meetings | Team meeting with TVS team to discuss regarding new requirement of Sedemac EMS address change. Prepared Deleivery scope and Shared with Manesh Sir. |
2.00 | |
| 19 | 2025-05-07 10:08 | Pravin Lonkar | Project Documentation | U577 Project requirement study and Efforts estimation preperation. |
3.00 | |
| 20 | 2025-05-07 09:59 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team regarding Cost Breakup for N600 project, Multibinary testing plan, updated the Efforts estimation of N600 as per TVS requirement. |
5.00 | |
| 21 | 2025-05-05 17:48 | Pravin Lonkar | Project Documentation | Discussion with TVS team regarding new project requirement for H100. Studied technical Documents and prepared Efforts estimation and Delivery Scope document to share the quotation with TVS team. |
7.00 | |
| 22 | 2025-04-24 19:51 | Pranav Chandrakant Jagajampi | Leave or Permission | On personal leave |
9.00 | |
| 23 | 2025-04-02 09:56 | Sithan Kumar Palanichamy | Client (External) Meetings | TVS Hosur & Vendor VCI MFG - Order Finalization with customer - 3000 VCI and current project updates and upcoming project discussions. |
16.00 | |
| 24 | 2025-03-31 19:07 | Pravin Lonkar | Project Documentation | Prepared Quotation and Work Scope document for requirement of O2 Sensor reading in Hosur and Mysore Plant. |
7.00 | |
| 25 | 2025-03-31 16:51 | Pravin Lonkar | Other | Holiday |
8.00 | |
| 26 | 2025-03-31 12:59 | Pravin Lonkar | Leave or Permission | On Leave |
8.00 | |
| 27 | 2025-03-31 11:26 | Pravin Lonkar | Leave or Permission | on leave |
16.00 | |
| 28 | 2025-03-28 10:45 | Vimaladitya Srinivasan | Project Management | 1. eRIDE Scan -MCU Flashing issue2. 3W quote3. New Website project 4. Other projects |
6.00 | |
| 29 | 2025-03-27 08:31 | Vimaladitya Srinivasan | Project Management | 1. Cloud Project2. Other MSSI Activities |
4.00 | |
| 30 | 2025-03-25 20:44 | Vimaladitya Srinivasan | Project Management | 1. All projects2. Cloud developemnt |
6.00 | |
| 31 | 2025-03-24 21:12 | Vimaladitya Srinivasan | Project Management | 1. New VCI Projects2. New APK release3. Other activities |
6.00 | |
| 32 | 2025-03-20 21:04 | Vimaladitya Srinivasan | Project Management | 1. New VCI2. New Project - Website Scope document3. Cloud & AI projects |
6.00 | |
| 33 | 2025-03-19 18:21 | Vimaladitya Srinivasan | Android Development | 1. New VCI2. New Project - Website Scope document3. Cloud & AI projects |
6.00 | |
| 34 | 2025-03-19 18:20 | Vimaladitya Srinivasan | Project Management | All projects |
6.00 | |
| 35 | 2025-03-17 22:23 | Vimaladitya Srinivasan | Project Management | 1. New VCI Development2. New Project - Analysis: Website Project3. OBD2B |
4.00 | |
| 36 | 2025-03-13 18:17 | Vimaladitya Srinivasan | Project Management | 1. New VCI Topic: Pricol – RR310 Cluster report will be given by tomorrow first half Mikuni OBD1 – Report will be given by 15th first half Once the above 2 done, we can consider 90% of the ECU Flashing development is done Keyless ECU Flashing status Vimal to send an email to Ram, requesting for documentation along with query N597 Cluster status Testing in progress BOSCH OBD IIB Tamil to verify the given CAN Logs from EOL team Field Issues XL 100 DTC issue: To be resolved by 15th first half Installation issue: TZ to share the screen record with instructions 6. Aftermarket Evaluation meeting |
6.00 | |
| 37 | 2025-03-12 20:34 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | Laptop gate pass renewal in MAHINDRA |
1.00 | |
| 38 | 2025-03-12 20:21 | Vimaladitya Srinivasan | Project Management | Issues to be addressed: Installation issue BT Disconnection Issue XL 100 DTC issue Keyless ECU Flashing: Mostly by today EOD will be sharing the updated APK OBD2B: Pending: Bosch ECU, Sedemac ECU Flashing N597 Cluster Flashing: Testing in progress at TVS New VCI: Updated the status, will be sharing the report for Mikuni 1 & 2 Karthick may travel on 18th 6. Italy VCI analyisis7. Cloud & AI |
6.00 | |
| 39 | 2025-03-11 20:34 | Vimaladitya Srinivasan | Other | Cloud & AI |
2.00 | |
| 40 | 2025-03-11 20:33 | Vimaladitya Srinivasan | Project Management | All projects |
2.00 | |
| 41 | 2025-03-10 21:46 | Vimaladitya Srinivasan | Project Management | 1. New VCI plan2. Other projects |
2.00 | |
| 42 | 2025-03-07 19:18 | Vimaladitya Srinivasan | Project Management | 1. All projects sync up |
2.00 | |
| 43 | 2025-03-06 20:24 | Vimaladitya Srinivasan | Project Management | 1. Keyless ECU- Sync up meet and status update2. N597 - Sync up meet and status update3. Billing list creation4. Cloud & AI research |
6.00 | |
| 44 | 2025-03-05 20:15 | Vimaladitya Srinivasan | Other | 1. Cloud & AI |
6.00 | |
| 45 | 2025-03-04 20:18 | Vimaladitya Srinivasan | Project Management | 1. New VCI Testing2. IB apk delivery3. SKU Based VCU Flashing |
6.00 | |
| 46 | 2025-03-03 18:36 | Vimaladitya Srinivasan | Project Management | 1. VCI testing plan2. Cloud & AI R&D3. eRIDE Scan Release - 5.14. IB Testing & validation |
6.00 | |
| 47 | 2025-02-28 19:00 | Vimaladitya Srinivasan | Project Management | All projects |
6.00 | |
| 48 | 2025-02-28 19:00 | Vimaladitya Srinivasan | Project Management | Field level issues: APK installation - play OBD2B Jupiter vitesco - flashing tested completed Sedemac & Hitachi - flashing testing going on Bosch (raider & 1602v) - App given, testing to be done! Need to have a joint call New VCI Testing To discuss Manesh eRIDEScan 09 Vehicle - Disable VCU flashing based on given SKU SKU Based VCU Flashing Merging Project TZ ready with efforts IB app - Test link Need to provide a test link for New Ntorq Flash files for Mileage improvement Specifically for Nepal Country. Vehicle ID:82, TVS Ntorq Version 3(Nepal) Model name: ,New ECU OBD2 -> Button name: NTORQ RE Nepal FE improvement Vehicle ID:88, TVS Ntorq Efi Race XP Model name: , New ECU OBD2 -> Button Name: NTORQ XP Nepal FE improvement IB app - Raider BOSCH OBD2 ECU Flashing issue Need to check with raj |
7.00 | |
| 49 | 2025-02-28 13:49 | Pravin Lonkar | Client (External) Meetings | Meeting with TVS team regarding new project requirement. |
1.00 | |
| 50 | 2025-02-28 13:28 | Pravin Lonkar | Leave or Permission | Medical Leave |
8.00 | |
| 51 | 2025-02-27 23:39 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB priority, delivery, and status update |
0.50 | |
| 52 | 2025-02-26 13:45 | Vimaladitya Srinivasan | Project Management | eRIDE Scan 09 Vehicle - SKU Based VCU Flashing TZ New VCI Testing Ble Pros: Need data by today EOD Ble testing target date Wi-Fi & USB: OBD2B Jupiter vitesco - flashing tested completed Sedemac & Hitachi - flashing to be done Bosch RTR1602v - App given, testing to be done! N597 Cluster |
6.00 | |
| 53 | 2025-02-25 13:09 | Vimaladitya Srinivasan | Project Management | 1. OBD2B BOSCH ECU Flashing - analysis with TVS-TZ- Observations: Seems like new ECU Flashing needs to be developed 2. SKU Based VCU Flashing - quote approved3. eRIDE Scan u546 - testing: discussed with ritika & shivam4. VCI test plan5. Cloud & AI- research |
5.00 | |
| 54 | 2025-02-24 14:43 | Vimaladitya Srinivasan | Project Management | 1. VCI Testing & Analysis, Coordination TVS-MAHLE-TZ2. Keyless ECU Log file analysis3. Research on Cloud & AI |
7.00 | |
| 55 | 2025-02-21 14:33 | Vimaladitya Srinivasan | Project Management | 1. VCI testing2. Research - Cloud & AI |
6.00 | |
| 56 | 2025-02-20 23:12 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB priority, delivery, and status update |
0.50 | |
| 57 | 2025-02-20 13:38 | Vimaladitya Srinivasan | Project Management | 1. eRIDE Scan - PFA.. Active login users of staging APK U388 / U546 - Please help us provide the test report at earliest SKU based ECU Flashing – Quote shared to Sunil sir, waiting for your go ahead2. N597 Log file- 3. keyless ECU log file analysis4. Research - Data & AI |
6.00 | |
| 58 | 2025-02-19 14:27 | Vimaladitya Srinivasan | Project Management | RIDE Scan 2.0 - Prepare the release Notes IUPR ratio -2 For all the OBD2B Vehicles, need to add this in IUPR list Need to add this in Data Collection Event - Azure as well 7DF & 7E0 IUPR - Intake Air Temperature & MAP Value PID received For All the OBD2B Vehicles 7DF & 7E0 EV Commonization in RIDE Scan 2.0 Need to update by first half USB-Wi-Fi & BT VCI validation Plan Need to update by first half OBD2B Vehicle spread sheet update Karthick to update sheet & share it with us Point Of Contact - hierarchy OBD2B Vehicle list- for Quote Fogbugz -topic |
5.00 | |
| 59 | 2025-02-19 14:26 | Vimaladitya Srinivasan | Project Management | ECU Manufacturer/VehicleECU TypeBluetooth WIFIUSBin minutesBoschEMS4.52 VitescoEMS15.33 Cluster -RTRApp4515 MikuniOBD230Tomorrow SedemacOBD230Tomorrow MikuniOBD1 |
5.00 | |
| 60 | 2025-02-19 14:25 | Vimaladitya Srinivasan | Analysis | Ankit call eRIDE Scan Merge into RIDE Scan - time & cost? Wifi VCI EMS -BOSCH Flashing time? MIKUNI 1 - Flashing time? MIKUNI 2 - Flashing time? USB VCI EMS- BOSCH Flashing time? Mikuni 1 - Flashing time? Mikuni 2 - Flashing time? PPT: Slide 1 : Current Project specs Slide 2: Proposal Regular Customer Independent After market3. Tamil call:- New VCI testing plan- eRIDE Scan merging plan |
6.00 | |
| 61 | 2025-02-19 00:37 | Sithan Kumar Palanichamy | Inter-team Meetings | VCI related topic | Queries | TVS-MAHLE |
1.00 | |
| 62 | 2025-02-13 15:33 | Vimaladitya Srinivasan | Project Management | 1. Keyless ECU Supplier Meeting DID list & remarks that we noted during the call ECU Flashing: We shared the data mismatch comparison (App simulated log vs CAN Log provided ) , requested accurate PCAN log & ECU Flash file. 2. eRIDE Scan Meeting Vimal to share the latest UAT apk Shivam & Team to test the U546 all diagnostics functions Give MAHLE the test report by 17-02-2025 or so Next sync up call is scheduled on 18-02-2025 Once U546 Is tested, TVS to test U388 Vehicle3. Quotes suggestion -RTR 160 2V, 180 2V & 160 4V – Connected Cluster Flash- N597 Cluster Diagnostics & Flashing | Scope | Quote | Visteon Cluster |
8.00 | |
| 63 | 2025-02-13 00:05 | Sithan Kumar Palanichamy | Inter-team Meetings | Discussed with Vimal to prepare the estimation for the following projects,1. Keyless ECU U7122. Keyless ECU U7133. OBD2 B4. eRidescan SKU Based Flashing |
2.00 | |
| 64 | 2025-02-12 13:11 | Vimaladitya Srinivasan | Project Management | 1. DTC CODE not visible- Raider Sedemac ECU2. Making VHR it as VAS through TVS Aggregator platform via wallet recharge. 3. R&D - Data &AI |
6.00 | |
| 65 | 2025-02-12 13:09 | Vimaladitya Srinivasan | Analysis | 1. SKU based Interlock Software flashing VCU- API2. Scope & Quote discussion U713, OBD2B |
5.00 | |
| 66 | 2025-02-12 13:08 | Vimaladitya Srinivasan | Analysis | 1. OBD2B Raider EMS 2. Europe eRIDE Scan3. Keyless ECU Flashing CAN Log4. Raider SEdemac ECU- DTC request change |
5.00 | |
| 67 | 2025-02-11 23:41 | Sithan Kumar Palanichamy | Inter-team Meetings | Meeting: MAHLE Feedback : Diagnostic tool requirements |
1.00 | |
| 68 | 2025-02-05 16:48 | Vimaladitya Srinivasan | Project Management | RIDE Scan 2.0 Xl100 Obd2 flashing issue fixed SKU selection - raider 125 Xl100 detect recovery app Data collection Azure data push enabled. |
4.00 | |
| 69 | 2025-02-05 16:48 | Vimaladitya Srinivasan | Analysis | 1. Data & AI - Research2. MSSI Projects status, management, etc |
6.00 | |
| 70 | 2025-02-04 21:01 | Sithan Kumar Palanichamy | Other | Coordination with TZ regarding Quote for SendGrid & AWS Invoices - January 2025 |
0.50 | |
| 71 | 2025-02-04 20:08 | Sithan Kumar Palanichamy | Project Management | Prepared and shared January 2025 Engineers Hours Document in the new format shared by Mr. Manesh. |
1.00 | |
| 72 | 2025-02-03 13:16 | Vimaladitya Srinivasan | Other | 1. Worked on R&D - Data & AI2. Mikuni OBD2 ECU Flashing issue3. Project documentation |
8.00 | |
| 73 | 2025-01-31 17:47 | Vimaladitya Srinivasan | Bug Fixing | RIDE Scan 2.0 Bug fixing |
6.00 | |
| 74 | 2025-01-31 17:46 | Vimaladitya Srinivasan | Android Development | Keyless ECU - Architecture diagram Pravin to send the flow chart Correlate the data RIDE Scan EU - IUPR Data RIDE Scan EU -05 Vehicle addition |
6.00 | |
| 75 | 2025-01-31 17:46 | Vimaladitya Srinivasan | Application Database Design | 1. Dealt with field issues |
4.00 | |
| 76 | 2025-01-31 17:41 | Vimaladitya Srinivasan | Analysis | Project management |
4.00 | |
| 77 | 2025-01-31 17:41 | Vimaladitya Srinivasan | Analysis | Research on Data & AI |
4.00 | |
| 78 | 2025-01-31 17:40 | Vimaladitya Srinivasan | Analysis | 1. Auto VIN Detection Raider Issue - Variant Selection for Specific SKUs2. MIKUNI OBD2 ECU Flashing3. |
4.00 | |
| 79 | 2025-01-31 03:59 | Sithan Kumar Palanichamy | Client (External) Meetings | 1. Project Proposal review & clarification meeting with Tamilzorous2. Discussion with the Mahle & Norton team on the new requirement for OES. |
1.00 | |
| 80 | 2025-01-31 03:40 | Sithan Kumar Palanichamy | Leave or Permission | On Permission |
2.00 | |
| 81 | 2025-01-31 03:31 | Sithan Kumar Palanichamy | Inter-team Meetings | Ridescan projects discussion |
0.50 | |
| 82 | 2025-01-31 03:27 | Sithan Kumar Palanichamy | Inter-team Meetings | Virtual Town-hall meeting |
1.00 | |
| 83 | 2025-01-31 03:01 | Sithan Kumar Palanichamy | Leave or Permission | Half a day leave |
4.00 | |
| 84 | 2025-01-31 03:00 | Sithan Kumar Palanichamy | Leave or Permission | On Leave |
8.00 | |
| 85 | 2025-01-31 02:53 | Sithan Kumar Palanichamy | Inter-team Meetings | Ridescan Architecture Understanding discussion with Vimal and Tushar |
1.50 | |
| 86 | 2025-01-31 02:47 | Sithan Kumar Palanichamy | Leave or Permission | On year-end privilege leave |
48.00 | |
| 87 | 2025-01-31 01:50 | Sithan Kumar Palanichamy | Leave or Permission | First-half leave for the day |
4.00 | |
| 88 | 2025-01-31 01:32 | Sithan Kumar Palanichamy | Inter-team Meetings | 1. Welcoming Felix Meeting2. Internal Meeting - MSSI |
1.50 | |
| 89 | 2025-01-29 17:35 | Vimaladitya Srinivasan | Other | Data & AI |
2.00 | |
| 90 | 2025-01-29 17:34 | Vimaladitya Srinivasan | Project Documentation | 1. Project Management2. Requirement sheet3. Project Overview sheet4. Issues Sheet5. SOP Document |
4.00 | |
| 91 | 2025-01-29 17:06 | Pravin Lonkar | Client (External) Meetings | Discussion with Mr. Prabhu from TVS regarding MCU flashing. |
1.00 | |
| 92 | 2025-01-28 18:29 | Sithan Kumar Palanichamy | Leave or Permission | On Privilege leave |
32.00 | |
| 93 | 2025-01-28 18:28 | Sithan Kumar Palanichamy | Leave or Permission | On Privilege leave |
16.00 | |
| 94 | 2025-01-28 16:41 | Pravin Lonkar | Leave or Permission | Half day leave due to medical reason. |
4.00 | |
| 95 | 2025-01-28 16:36 | Pravin Lonkar | Project Management | Fogbugz raised for:VAT license renewal for Pravin Lonkar.VAT license renewal for TVS.ReportLogiq license renewal for TVS. |
3.00 | |
| 96 | 2025-01-28 15:56 | Vimaladitya Srinivasan | Android Development | Worked on Documentation of SoPInternal meetings, project planning |
4.00 | |
| 97 | 2025-01-23 04:44 | Sithan Kumar Palanichamy | Leave or Permission | Took Day-Off for Pongal / Sankranti Festival |
8.00 | |
| 98 | 2025-01-23 04:41 | Sithan Kumar Palanichamy | Inter-team Meetings | Discussed with Vimal to identify the CAN vehicle IDPrepare the API documents to share with TusharPrimary API(Contains Vehicle Decoding Information)Secondary API(Contains Vehicle Diagnostics Data) |
2.00 | |
| 99 | 2025-01-23 04:39 | Sithan Kumar Palanichamy | Inter-team Meetings | Ridescan Architecture Understanding discussion with Vimal and Tushar. |
1.50 | |
| 100 | 2025-01-23 04:16 | Sithan Kumar Palanichamy | Inter-team Meetings | 1. MSSU/MSSI - FB Meeting 2. FB 28474 Meeting |
0.50 | |
| 101 | 2025-01-17 14:16 | Vimaladitya Srinivasan | Project Management | RIDE Scan 2.0 Issues BOSCH EMS Flashing Issue OPEN 1. Issue observered in RTR 310, RR310, RTR Series 2. BT getting disconnected after Routine Reqeust (Before Erase request) 3. Issue Open date - 15-01-2025 TVS Jupiter VITESCO ECU Flashing OPEN 1. Need to wait after completing the First region 2. BT abruptly getting disconnected 3. All BOSCH EMS ConditionsNotCorrect for CVN & CALID OPEN Log file Firmware Check for 7,8,9 series OPEN 10.6 APK - We need to work on blocking other vehicles except MIKUNI XL100 OBD1?? OPEN TVS Raider ECU Flashing OPEN 00605415012025125546.txt, XL 100 OBD 1- Old VCI OPEN 1. Check with TZ, if we can make use of popup to enter VIN Manually. TVS Sport - ECU Flashing status mismatch dashboard/app OPEN TVS Jupiter VITESCO ECU Flashing OPEN |
4.00 | |
| 102 | 2025-01-16 04:24 | Pravin Lonkar | Leave or Permission | OFF taken for some urgent personal work. |
1.00 | |
| 103 | 2025-01-16 04:20 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team on ongoing EOL projects timeline, pending PO's and Quotations. |
1.00 | |
| 104 | 2025-01-14 14:50 | Vimaladitya Srinivasan | Analysis | Worked on RIDE Scan 2.0.6 - Field Issue, 1) VIN: MD624BE80R2N04381- VIN not found in the TVS VIN database. 2) VIN: MD634BE82P2D02878- Vehicle information could not be fetched from the TVS VIN Attributes JSON file due to mismatched controller type mappings. - Below are the controller types mapped for this VIN in the TVS VIN Attribute file: - EMS Controller: BOSCH - ABS Controller: Conti - ICU Controller: PRICOL - In MAHLE Vehicle DB, for the vehicle *TVS APACHE RTR 160 2V RM*, the following controller type mappings were present: - EMS Controller: BOSCH - ABS Controller: BOSCH - ICU Controller: PRICOL To resolve this, we have updated the mapping by associating the ABS controller Conti with the existing configuration. The vehicle information is now successfully fetching. 3. As requested by Ram & Ankit sir, we have reverted to default OTP(123456) process for Manual Vehicle Selection |
4.00 | |
| 105 | 2025-01-13 17:41 | Vimaladitya Srinivasan | Project Management | 10.6 Mikuni Flashing: Need to block all the vehicles except for Mikuni-OBD1 Ensure that Sedemac/Keihin Issues Are you checking for latest Firmware version of 7,8,9 series in RIDE Scan 2.0 |
4.00 | |
| 106 | 2025-01-13 17:40 | Vimaladitya Srinivasan | Analysis | RIDE Scan Issues: Sedemac & Keihin ECU Flashing Issues: As per Karthick's confirmation, We have guided our CSD (Customer Support Dept) to give 10.6 APK to specific critical dealers till 13-01-2025 We visited dealership on Friday, fixed the Sedemac & Keihin ECU Flashing related issues Shared the APK to Karthick on 11-01-2025 Waiting for TVS feedback to go ahead release this APK to field. ECU List: Vimal shared the list on 10-01-2025 Waiting for the ECU setup. Keyless ECU Development: MAHLE shared UAT APK along with test report on 10-01-2025, Waiting for feedback from TVS N597 Development: TVS to confirmed that U400 Cluster Flashing sequence/spec document, DTCs list to be followed for N597 Cluster Waiting for the .bin file reading logic Once all data received, MAHLE to share the efforts estimation, timeline. OBD 2B Development: Scheduled a discussion today with Sithan sir & Karthick for Backend API Accommodation Flash Files, CAN Logs, Diagnostics data, Sec Algo -ECU Spec documents -XL100 ES/KS (Needed from TVS) TVS to provide flash files and other pending data We will provide the efforts estimation for the given vehicles/ECUs Development by 14-01-2025 OBD1 Mikuni Issue with 0 series VCI: Work in Progress at MAHLE US Office Will share the exact target date in 1-2 days |
5.00 | |
| 107 | 2025-01-09 14:47 | Pravin Lonkar | Inter-team Meetings | Discussion with MSSU regarding Multi binary implementation. |
0.50 | |
| 108 | 2025-01-09 04:10 | Sithan Kumar Palanichamy | Inter-team Meetings | Process improvement discussion for ridescan application and hardware supply- Customer Support Activity, Problem statement and solution- Standard pricing of hardware and software from vendor- New development with MAHLE & Tamilzorous |
1.50 | |
| 109 | 2025-01-08 16:49 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily Stand-up meeting of current task updates |
0.50 | |
| 110 | 2025-01-08 16:45 | Pravin Lonkar | Inter-team Meetings | Discussion with Sameer regarding sending invoice copies to Mallamma for project payment initiation. |
0.50 | |
| 111 | 2025-01-08 13:46 | Vimaladitya Srinivasan | Analysis | Raider flashing Sabarwal Auto 1. Temp solution, we have given a build to Ram 2. Need to follow up with Ram 3. Perm. Solution to be discussed and given Raider flashing 14670, (Prabhu TM) 1. Logs analysis started 2. Issue similar to Sabarwal Auto XL 100 issue Siddi vinayak auto Assumption : ECU not responding at AUTO-VIN Detect logic Keihin Flashing 1. Number shared to saddam 2. No support from Toll free number 3. Sameer to check this ECU setup needed Raider SEDEMAC OBD I, OBD2, Keihin ECU Customer support 1. CSD follow up is not there 2. Customer support closure is not 3. Wayforward to be decided along with Manesh-Karthick-vimal 4. need to |
5.00 | |
| 112 | 2025-01-08 04:59 | Sithan Kumar Palanichamy | Inter-team Meetings | MSS Technical Resource Alignment within Asia-Pacific discussion with MSS-China team.. |
1.00 | |
| 113 | 2025-01-08 04:57 | Sithan Kumar Palanichamy | Inter-team Meetings | Discussion on 7 Series VCI Development Cost by inhouse contribution to reduce the vendor costings and software code repository under Mahle from any vendors. |
1.00 | |
| 114 | 2025-01-07 17:18 | Pravin Lonkar | Inter-team Meetings | Meeting with MSS China team for team introduction and business line introduction between India & China team. |
1.00 | |
| 115 | 2025-01-07 16:24 | Vimaladitya Srinivasan | Inter-team Meetings | Action items on MSSI: Record keeping for ECRs / Bugs/ New Development Vendor Standard Costing Allocation of work In-house/outsource Outsource costing: Vendor quotation review Pricing of Standard activity related to RIDE Scan development Identify list -vimal |
4.00 | |
| 116 | 2025-01-06 16:14 | Pravin Lonkar | Analysis | Study of Kiehin and Sedemec Flash procedures to analyze the work efforts required to implement auto check sum in Kiehin ECU. |
1.50 | |
| 117 | 2025-01-06 12:24 | Vimaladitya Srinivasan | Analysis | VIN - "request out of range" / "Service Not Supported" We are internally checking our logic & all other worst case scenarios Scenario 1: Issue occurs during "Manual Vehicle Selection" OBD 2B: Reviewing the given documents Working on preparing the requirement spreadsheet, responsibilities, target dates etc. Keyless ECU Development: ECU setup received and setup done on 03-01-2025 Working on integrating the APIs, can be completed by 08-01-2025 Live parameters, DTCS are working Write data UUID implementation, need clarification from Ram Compressed PDF: Planning to release the APK by 10-01-2025 Old Application to be blocked: Blocked all the applications, reverifying.. Mikuni OBD1 7 series VCI Topic: In discussion with Karthick on call |
4.00 | |
| 118 | 2025-01-06 12:11 | Pravin Lonkar | Other | Collected Non-Domain Laptop from Warehouse for New VAT version installation for Multi binary testing. |
1.00 | |
| 119 | 2025-01-06 07:16 | Sithan Kumar Palanichamy | Inter-team Meetings | Discussion with TZ team to discuss the points discussed on TVSM Sync up call. |
1.00 | |
| 120 | 2025-01-03 13:14 | Vimaladitya Srinivasan | Analysis | - All Project status analysis |
4.00 | |
| 121 | 2025-01-03 12:19 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team on Issue they are facing with Sedemec OBD-2B Flashing and new requirement for implementing Auto Check Sum Calculation for Sedemec ECU Flashing. |
2.00 | |
| 122 | 2025-01-03 04:40 | Sithan Kumar Palanichamy | Other | Talent Cycle Update - Performance and Development Dialogue 2024/2025 |
1.00 | |
| 123 | 2025-01-02 14:44 | Sithan Kumar Palanichamy | Other | IT Assets Handover from Vengat1. Laptops (1 HP laptop & 1 DELL laptop) with chargers2. One Panasonic Toughbook & its charger3. One iPhone SE4. One VAT Dongle |
2.00 | |
| 124 | 2025-01-02 14:25 | Vimaladitya Srinivasan | Inter-team Meetings | Discussed with Sithan - Keyless ECU Development. - Timesheet usage - Upcoming tasks |
1.00 | |
| 125 | 2025-01-02 13:53 | Vimaladitya Srinivasan | Inter-team Meetings | 1. MSS Project status- TechPRO/RIDE Scan - 2hrs- Discussed with Manesh - Listed down the projects forecast- Listed down the Billing related activities |
2.00 | |
| 126 | 2025-01-02 13:35 | Pranav Chandrakant Jagajampi | Leave or Permission | On leave |
54.00 | |
| 127 | 2025-01-02 13:05 | Pranav Chandrakant Jagajampi | Leave or Permission | On leave |
9.00 | |
| 128 | 2024-12-10 12:30 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 129 | 2024-12-10 12:29 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 130 | 2024-12-10 12:28 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 131 | 2024-11-28 18:50 | Pravin Lonkar | Leave or Permission | Leave |
9.00 | |
| 132 | 2024-11-28 18:34 | Pravin Lonkar | Leave or Permission | Permission - Assembly Election in Maharashtra. |
9.00 | |
| 133 | 2024-11-28 04:32 | Pravin Lonkar | Leave or Permission | Leave |
9.00 | |
| 134 | 2024-10-29 04:19 | Pranav Chandrakant Jagajampi | Leave or Permission | Personal Leave |
18.00 | |
| 135 | 2024-10-28 20:30 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Coordination & technical support for Mahle Team, TVSM Team & Ridescan development team. (average of 1hours/each day) |
24.00 | |
| 136 | 2024-10-28 20:27 | Sithan Kumar Palanichamy | Inter-team Meetings | DOM Meeting - Average 30 minutes per day. |
10.00 | |
| 137 | 2024-10-28 20:03 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | EA Migration Activity conducted from Mr. Gulshan from TVSM team. Support given for all ridescan application database server (dev, uat, prod applications) migration activities for the downtime and updating the new configurations in all applications and smoke testing after update. |
4.50 | |
| 138 | 2024-10-28 05:00 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Ridescan DB cutover Discussion with TVSM team (Mr. Gulshan & Team) |
0.50 | |
| 139 | 2024-10-27 20:18 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team on available option to implement the option mod through API. |
3.00 | |
| 140 | 2024-10-27 20:11 | Pravin Lonkar | Project Management | Inter-team discussion and option workout for providing solutions for TVS team requirement of OBD-2B PCM_Type option mod implementation through API. |
8.00 | |
| 141 | 2024-10-27 19:17 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 142 | 2024-10-27 19:15 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 143 | 2024-10-27 18:12 | Pravin Lonkar | Project Documentation | Efforts estimation preparation for 3W EV database modifications requirement. |
6.00 | |
| 144 | 2024-10-25 17:39 | Pravin Lonkar | Project Documentation | Requirements study for EOL 3Wheeler EV database modifications. |
7.00 | |
| 145 | 2024-09-26 17:28 | Pravin Lonkar | Project Documentation | Project timesheet update.Project List updation with workhours details.Discussion with TVS Team on Project timeline and PO Status. |
8.00 | |
| 146 | 2024-09-26 12:23 | Pravin Lonkar | Project Documentation | Keyless ECU pairing new document study |
8.00 | |
| 147 | 2024-09-26 12:12 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team regarding new project requirement for 3W EV. |
2.00 | |
| 148 | 2024-09-26 12:09 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS Team for PEPS Keyless ECU Pairing. |
2.00 | |
| 149 | 2024-09-26 11:08 | Pravin Lonkar | Project Documentation | Bosch ECU address change requirement study, Efforts estimation preparation and testing support. |
8.00 | |
| 150 | 2024-09-03 15:20 | Pranav Chandrakant Jagajampi | Leave or Permission | On personal leave |
9.00 | |
| 151 | 2024-09-03 15:19 | Pranav Chandrakant Jagajampi | Leave or Permission | Personal leave |
9.00 | |
| 152 | 2024-09-03 15:12 | Pranav Chandrakant Jagajampi | Other | MSS Training completed |
2.00 | |
| 153 | 2024-08-18 13:19 | Pravin Lonkar | Project Documentation | Revised Efforts estimation and delivery scope documents for ICM ABS, U711 and Mult binary projects as per TVS requirements. |
7.00 | |
| 154 | 2024-08-18 13:12 | Pravin Lonkar | Project Documentation | Keyless ECU pairing and Diagnostic requirements study and Efforts estimation & Scope document preparation. |
7.00 | |
| 155 | 2024-08-18 13:01 | Pravin Lonkar | Project Management | TVS EOL project sheet updation. |
2.00 | |
| 156 | 2024-08-18 12:59 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team on New projects(U712/U713 Keyless feature implementation) requirements. |
1.00 | |
| 157 | 2024-08-14 07:06 | Pranav Chandrakant Jagajampi | Other | 1. Gate pass renewal procedure done |
5.00 | |
| 158 | 2024-08-14 07:04 | Pranav Chandrakant Jagajampi | Other | 1. Gate pass renewal procedure started compliance sign taken |
3.00 | |
| 159 | 2024-08-14 07:00 | Pranav Chandrakant Jagajampi | Other | 1. Gate pass renewal documents collected from MAHLE office |
3.00 | |
| 160 | 2024-07-29 04:05 | Pravin Lonkar | Leave or Permission | Leave |
9.00 | |
| 161 | 2024-07-29 04:04 | Pravin Lonkar | Leave or Permission | Leave |
9.00 | |
| 162 | 2024-07-20 15:27 | Pranav Chandrakant Jagajampi | Leave or Permission | On leave |
9.00 | |
| 163 | 2024-07-20 15:15 | Pranav Chandrakant Jagajampi | Client (External) Meetings | 1. Vector free session did |
4.00 | |
| 164 | 2024-07-20 15:07 | Pranav Chandrakant Jagajampi | Leave or Permission | On leave |
9.00 | |
| 165 | 2024-07-01 04:22 | Pravin Lonkar | Project Documentation | DLX requirement document and Workhours effort estimation document & Delivery scope document preparation for U400 project new requirement of TPMS default value writing &IMU sequence change. |
7.00 | |
| 166 | 2024-07-01 03:14 | Pravin Lonkar | Project Documentation | Work efforts estimation and Delivery Scope document preparation for new requirement in BMW U400 line. |
7.00 | |
| 167 | 2024-07-01 02:34 | Pravin Lonkar | Client (External) Meetings | Meeting with TZ pvt lts to discuss the features of TechPRO VCI. |
1.00 | |
| 168 | 2024-06-28 10:20 | Pravin Lonkar | Client (External) Meetings | Discussion Tamil Zorus team, Study of Techinical specification for 24V TechPRO VCI shared by TZ pvt ltd. |
4.00 | |
| 169 | 2024-06-28 07:14 | Pranav Chandrakant Jagajampi | Other | 1. Laptop gatepass renwal |
3.00 | |
| 170 | 2024-06-28 07:01 | Pranav Chandrakant Jagajampi | Leave or Permission | Sick leave with permission |
9.00 | |
| 171 | 2024-06-28 04:20 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 172 | 2024-06-28 04:19 | Pravin Lonkar | Leave or Permission | Leave |
8.00 | |
| 173 | 2024-06-18 08:06 | Pravin Lonkar | Client (External) Meetings | Collected VCI's from Warehouse. |
3.00 | |
| 174 | 2024-06-18 08:04 | Pravin Lonkar | Client (External) Meetings | MSS EOL products (VCI, EOL Tool Chain) presentation in Tata Motors. |
5.00 | |
| 175 | 2024-06-18 08:02 | Pravin Lonkar | Client (External) Meetings | Daily Tasks Updates. |
1.00 | |
| 176 | 2024-06-18 08:00 | Pravin Lonkar | Project Documentation | Work out on Standard work hours calculation as per TVS requirements. |
4.00 | |
| 177 | 2024-06-12 15:48 | Pravin Lonkar | Project Documentation | Work out on Standard work hours calculation as per TVS requirements. |
3.00 | |
| 178 | 2024-06-11 17:24 | Pravin Lonkar | Project Documentation | Listing out Standard test and its Subtasks for preparation of Standard pricing quotation for TVS Motors. |
7.00 | |
| 179 | 2024-05-28 04:27 | Pravin Lonkar | Project Documentation | Proposal Documentation for TVS new requirement of multiple binary handling logic. |
7.00 | |
| 180 | 2024-05-25 07:34 | Pranav Chandrakant Jagajampi | Testing | 1. 24V VCI checked with new firmware updation software2. Q7 Invoice submitted to H block |
2.00 | |
| 181 | 2024-05-22 14:17 | Pravin Lonkar | Leave or Permission | Leave |
0.00 | |
| 182 | 2024-05-17 11:27 | Pravin Lonkar | Project Documentation | Work hours estimation & Scope of Work document preparation for Sedemac Phase-2, Sedemac OBD-II SENSORS ADDITION, KEIHIN Actuators addition. |
7.00 | |
| 183 | 2024-05-17 11:22 | Pravin Lonkar | Inter-team Meetings | Inter team discussion in multiple binary handling in one runtime. |
0.50 | |
| 184 | 2024-05-17 11:19 | Pravin Lonkar | Client (External) Meetings | Discussion with TVS team on Ongoing projects & New projects costing. |
0.50 | |
| 185 | 2024-05-15 12:45 | Pranav Chandrakant Jagajampi | Leave or Permission | Sick leave |
9.00 | |
| 186 | 2024-05-15 12:44 | Pranav Chandrakant Jagajampi | Leave or Permission | Due to the election in the MAHLE office official leave announced. |
9.00 | |
| 187 | 2024-05-07 04:51 | Sithan Kumar Palanichamy | Leave or Permission | On Leave |
8.00 | |
| 188 | 2024-05-06 16:18 | Pravin Lonkar | Project Documentation | Project Work hours estimation for MCU station interlocking in VCU station.Delivery Scope Document Preparation for VCU Station modifications. |
7.00 | |
| 189 | 2024-05-06 04:24 | Pravin Lonkar | Client (External) Meetings | Meeting with TVS team regarding Sedemac Phase 2 EOL development requirements. |
1.00 | |
| 190 | 2024-04-29 04:12 | Pravin Lonkar | Leave or Permission | Leave |
9.00 | |
| 191 | 2024-04-28 05:31 | Pranav Chandrakant Jagajampi | Inter-team Meetings | Daily meeting |
10.00 | |
| 192 | 2024-04-28 05:28 | Pranav Chandrakant Jagajampi | Analysis | 1. Report Logiq data coming or not checked2. ECU id not shown in PBF file log file raise FB3. Tech Pro 24V VCI checked and send report to tushar and vengat |
9.00 | |
| 193 | 2024-04-28 05:13 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. 8 VCI firmware updated2. 8 VCI checked3. DL3 3031 tried to follow steps as per jim but still solution not meet |
9.00 | |
| 194 | 2024-04-28 05:02 | Pranav Chandrakant Jagajampi | Leave or Permission | Taken casual leave. |
9.00 | |
| 195 | 2024-04-28 03:21 | Pranav Chandrakant Jagajampi | Inter-team Meetings | Daily meeting |
8.00 | |
| 196 | 2024-04-28 03:20 | Pranav Chandrakant Jagajampi | Inter-team Meetings | Daily meeting |
9.00 | |
| 197 | 2024-04-28 03:15 | Pranav Chandrakant Jagajampi | Leave or Permission | On leave |
27.00 | |
| 198 | 2024-04-27 11:50 | Pranav Chandrakant Jagajampi | Leave or Permission | Taken comp off leave |
9.00 | |
| 199 | 2024-04-27 09:17 | Pranav Chandrakant Jagajampi | Leave or Permission | Taken Comp off |
9.00 | |
| 200 | 2024-04-27 08:21 | Pranav Chandrakant Jagajampi | Leave or Permission | Taken Comp off |
9.00 | |
| 201 | 2024-04-27 08:06 | Pranav Chandrakant Jagajampi | Other | Final excel sheet sent to team regarding VAT License updation |
1.00 | |
| 202 | 2024-04-27 08:02 | Pranav Chandrakant Jagajampi | Inter-team Meetings | Daily internal teams meeting |
11.00 | |
| 203 | 2024-04-27 07:57 | Pranav Chandrakant Jagajampi | Other | Fogbugz updated for BAJAJ VAT license file |
1.00 | |
| 204 | 2024-04-27 07:56 | Pranav Chandrakant Jagajampi | Project Documentation | VAT license and RL license excel sheet updated |
2.00 | |
| 205 | 2024-04-21 03:05 | Pravin Lonkar | Analysis | Study of N597 project Requirement. |
8.00 | |
| 206 | 2024-04-20 11:45 | Pravin Lonkar | Project Documentation | Effort Estimation & delivery scope document prepared for U490 Project. |
8.00 | |
| 207 | 2024-04-19 10:00 | Pravin Lonkar | Other | VAT Training to Prabhakaran. |
2.00 | |
| 208 | 2024-01-23 19:34 | Sithan Kumar Palanichamy | Other | License Portal Fixes |
4.50 | |
| 209 | 2024-01-03 18:13 | Pranav Chandrakant Jagajampi | Inter-team Meetings | MAHLE internal meeting with MSS team |
9.00 | |
| 210 | 2024-01-03 18:13 | Pranav Chandrakant Jagajampi | Inter-team Meetings | MAHLE internal meeting with MSS team |
9.00 | |
| 211 | 2023-11-29 21:10 | Pranav Chandrakant Jagajampi | Leave or Permission | Personal Leave |
27.00 | |
| 212 | 2023-11-02 20:22 | Pranav Chandrakant Jagajampi | Inter-team Meetings | Internal DOM meeting |
10.00 | |
| 213 | 2023-11-02 20:09 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. OS issue on new laptop checked with MAHLE IT |
9.00 | |
| 214 | 2023-11-02 20:02 | Pranav Chandrakant Jagajampi | Team Coordination / Technical Support | 1. Old laptop given for check blue dump issue2. Two old laptop given for OS installation to IT team3. Data keep in backup in share drive |
9.00 | |
| 215 | 2023-11-02 19:48 | Pranav Chandrakant Jagajampi | Leave or Permission | Personal leave |
18.00 | |
| 216 | 2023-11-02 10:26 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting: Website <> Mahle Testing - Regarding how the cluster upgrade flow works from the point of purchasing the cluster feature from the TVSM website till the Order is captured in Mahle DMS. |
2.00 | |
| 217 | 2023-11-02 10:24 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting: Consolidation of Staging APKs in TVSM + Regularization of APK / ASW File Approval Process for eRide Scan Mobile App |
1.00 | |
| 218 | 2023-11-02 10:22 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU Meeting: Mahindra/DICV/TVS - Backlog refinement |
0.50 | |
| 219 | 2023-11-02 10:20 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting: Discussion to introduce U388 project to MAHLE by Mr.Gurusekar. |
1.50 | |
| 220 | 2023-11-02 10:19 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting: Discussion and closure of open points for diagnostic tool development. |
1.00 | |
| 221 | 2023-11-01 09:57 | Sithan Kumar Palanichamy | Other | Paid Holiday - Dussehra |
8.00 | |
| 222 | 2023-11-01 09:56 | Sithan Kumar Palanichamy | Leave or Permission | On Personal Leave |
8.00 | |
| 223 | 2023-11-01 09:56 | Sithan Kumar Palanichamy | Other | Paid Holiday |
8.00 | |
| 224 | 2023-10-13 10:44 | Sithan Kumar Palanichamy | Client (External) Meetings | Mahindra Meeting:Weekly Review - M&M DoIP Development |
1.00 | |
| 225 | 2023-10-13 10:19 | Sithan Kumar Palanichamy | Other | Interview Android Developer - Mohammed Umar |
0.50 | |
| 226 | 2023-10-13 10:18 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting - U400 Diagnostic tool and vehicle health report |
0.75 | |
| 227 | 2023-10-13 10:16 | Sithan Kumar Palanichamy | Client (External) Meetings | TZ-Mahle Sync up meeting with Vimal and Tamil to discuss the current status of all TVSM projects assigned. |
1.00 | |
| 228 | 2023-10-13 10:05 | Sithan Kumar Palanichamy | Analysis | Analysis of the existing cluster upgrade feature in Ridescan for the feasibility of scaling it up and checking the level of changes required to extend the cluster upgrade functionality. |
2.00 | |
| 229 | 2023-10-13 10:00 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Discussion with Vimal on the cluster upgrade feature implemented in Ridescan in order to understand the new development for RTR310 accessories. |
2.00 | |
| 230 | 2023-10-13 09:58 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting - RTR310 accessories (web creation for software payment + DMS integration) |
1.00 | |
| 231 | 2023-10-03 19:21 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB Priority, Delivery and Current status update meeting |
0.50 | |
| 232 | 2023-10-03 19:20 | Sithan Kumar Palanichamy | Inter-team Meetings | 24V VCI Technical Discussion |
1.00 | |
| 233 | 2023-10-03 19:19 | Sithan Kumar Palanichamy | Client (External) Meetings | MAHLE - TZ Sync up call for the current status of the TVSM projects |
1.50 | |
| 234 | 2023-10-03 19:12 | Sithan Kumar Palanichamy | Other | 1) MSSI AWS Server Maintenance - Extended Disk storage2) Installed and Enabled Composer - an application-level dependency manager for the PHP programming language to download and enable PHPMailer package to test the SMTP mode of email sending. |
2.00 | |
| 235 | 2023-10-03 19:10 | Sithan Kumar Palanichamy | Leave or Permission | Permission |
2.00 | |
| 236 | 2023-10-03 19:08 | Sithan Kumar Palanichamy | Project Management | Pulling the latest list of all active FB Tickets of Daimler and prioritization. |
1.00 | |
| 237 | 2023-10-03 18:57 | Sithan Kumar Palanichamy | Other | Holiday on the occasion of Ganesh Chaturthi Festival. |
8.00 | |
| 238 | 2023-10-03 18:47 | Sithan Kumar Palanichamy | Inter-team Meetings | Mahindra/DICV/TVS - Backlog refinements meeting |
0.25 | |
| 239 | 2023-10-03 18:47 | Sithan Kumar Palanichamy | Inter-team Meetings | Location Go-Engage Meeting with IT team |
0.25 | |
| 240 | 2023-10-03 18:45 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Technical Support was given to Yash (Bajaj) remote for CDMT JSON push to Truimph PCs. |
2.00 | |
| 241 | 2023-10-03 18:33 | Sithan Kumar Palanichamy | Project Management | Exported FB tickets and reviewed the open tickets for prioritization. |
1.50 | |
| 242 | 2023-10-03 18:15 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB Priority, Delivery and Status Update Meeting |
0.50 | |
| 243 | 2023-10-03 18:14 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting on the U400 Diagnostic tool development. |
1.00 | |
| 244 | 2023-10-03 18:12 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Coordinated with Vimal on the cluster upgrade and provided the details for a discussion with TVSM on a similar integration project. |
1.00 | |
| 245 | 2023-10-03 17:45 | Sithan Kumar Palanichamy | Client (External) Meetings | MAHLE & Tamilzorous sync up call for the project status. |
0.50 | |
| 246 | 2023-10-03 17:44 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting on U400 Diagnostic Tool Development |
1.00 | |
| 247 | 2023-10-03 17:39 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Coordination with Gaurav on the OES Password Reset Issue. |
1.00 | |
| 248 | 2023-10-03 12:51 | Sithan Kumar Palanichamy | Client (External) Meetings | TechPRO 24V VCI Development Progress1) Current status of manufacturing 24v sample units2) Current status of software integration3) Escalation point for immediate assistance4) Action items |
1.50 | |
| 249 | 2023-10-03 10:29 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM - iQube Diagnostic tool development meeting. |
1.00 | |
| 250 | 2023-10-03 10:26 | Sithan Kumar Palanichamy | Inter-team Meetings | Mahindra/DICV/TVS - Backlog refinements meeting with MSSU. |
0.50 | |
| 251 | 2023-10-03 10:25 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Coordination/Discussion with Gaurav on the following points:Password ResetRestriction of EMS ECU Replacement Feature if flashing has not been done. |
1.00 | |
| 252 | 2023-10-03 10:19 | Sithan Kumar Palanichamy | Other | Coordinated with the Bajaj IT Team for password reset and troubleshooting the VPN connection issue. |
3.00 | |
| 253 | 2023-10-03 10:16 | Sithan Kumar Palanichamy | Inter-team Meetings | Program Management Meeting |
0.50 | |
| 254 | 2023-10-03 10:04 | Sithan Kumar Palanichamy | Inter-team Meetings | Internal discussion with Vengat and Gaurav on the reference name used for V305 flashing. (BSVI_Engine_OBD2_V305) |
1.00 | |
| 255 | 2023-10-03 09:58 | Sithan Kumar Palanichamy | Inter-team Meetings | MAHLE & TZ - Sync up Call - Discussed all the project's current development status that are assigned to the TZ team. |
1.50 | |
| 256 | 2023-10-03 09:50 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB Priority, Delivery and Status Update |
1.00 | |
| 257 | 2023-10-03 09:47 | Sithan Kumar Palanichamy | Client (External) Meetings | Discussion on Ridescan Urgent Projects: Delivery Status: U489 : Flashing U489 : Vehicle health report 3W eRidescan 3w Other project |
1.00 | |
| 258 | 2023-10-03 09:45 | Sithan Kumar Palanichamy | Inter-team Meetings | 1) Coordinated with Vimal to check and updated him the Flashing file was not pulled for U467++ due to incorrect mapping. 2) Updating the RTR310 vehicle image in the backend server. |
1.00 | |
| 259 | 2023-09-29 12:56 | Pranav Chandrakant Jagajampi | Other | 1. Timesheet fillup2. DL3 tracker updated3. Visit report created |
7.00 | |
| 260 | 2023-09-28 15:05 | Pranav Chandrakant Jagajampi | Bug Fixing | 1. Waiting for approval from IT side to install all programs which i required2. Admin rights not provided to MSS_install folder |
9.00 | |
| 261 | 2023-09-28 15:04 | Pranav Chandrakant Jagajampi | Bug Fixing | 1. Laptop collected2. Recovered data |
9.00 | |
| 262 | 2023-09-28 15:03 | Pranav Chandrakant Jagajampi | Bug Fixing | 1. Kept data in backup2. Laptop handover to IT team |
9.00 | |
| 263 | 2023-09-07 10:01 | Sithan Kumar Palanichamy | Other | Interview Session for senior developer position - Sachin Chivate |
1.00 | |
| 264 | 2023-09-07 10:00 | Sithan Kumar Palanichamy | Other | Interview Session for senior developer position - Jagadeesh Pal |
1.00 | |
| 265 | 2023-09-07 09:59 | Sithan Kumar Palanichamy | Client (External) Meetings | RIDE Scan 3W-DMS 2.2 app R&D testing feedback for -Reg - Conversion factor updation input |
1.00 | |
| 266 | 2023-09-07 09:58 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting - iQube Diagnostic tool development: Discussion & closure of open points for diagnostic tool development. |
1.00 | |
| 267 | 2023-09-07 09:25 | Sithan Kumar Palanichamy | Other | Timesheet update for August |
1.00 | |
| 268 | 2023-09-07 09:13 | Sithan Kumar Palanichamy | Inter-team Meetings | 1) Coordinated with Vimal on U489 TPMS communication from TVSM2) Discussed with Vimal & Tamil on Mikuni FB update |
1.50 | |
| 269 | 2023-09-07 09:09 | Sithan Kumar Palanichamy | Inter-team Meetings | Program Management Meeting |
1.00 | |
| 270 | 2023-09-01 10:22 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB Priority, Delivery and Status Update meeting |
0.50 | |
| 271 | 2023-09-01 10:18 | Sithan Kumar Palanichamy | Analysis | DICV FogBugz Review on pending activities. |
2.00 | |
| 272 | 2023-09-01 10:05 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Coordination with the team and support are given to Tushar and the DICV team on the build release. |
2.00 | |
| 273 | 2023-09-01 09:13 | Sithan Kumar Palanichamy | Client (External) Meetings | TechPRO 24V VCI Development Progress Meeting |
1.00 | |
| 274 | 2023-09-01 09:12 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Meeting: iQube Diagnostic tool development |
1.00 | |
| 275 | 2023-08-31 14:58 | Pranav Chandrakant Jagajampi | Inter-team Meetings | 1. Discussed regarding MAHINDRA activities2. Laptop related issue shown to Shrikant |
9.00 | |
| 276 | 2023-08-30 10:18 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Coordination with Tushar: 1. To release the latest build by downloading through a temporary server link. 2. New ECU ID info for the Rapid prime Tool for INS parameterization |
1.00 | |
| 277 | 2023-08-30 10:06 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily stand up of the current task updates |
1.00 | |
| 278 | 2023-08-29 11:26 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI - FB Priority, Delivery and Status update |
1.00 | |
| 279 | 2023-08-29 11:23 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup of the current task updates |
0.75 | |
| 280 | 2023-08-29 11:20 | Sithan Kumar Palanichamy | Client (External) Meetings | DICV Meeting: HDT Platform Overview - DICV Explanation |
1.00 | |
| 281 | 2023-08-29 11:19 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup of the current task updates |
0.50 | |
| 282 | 2023-08-29 11:13 | Sithan Kumar Palanichamy | Inter-team Meetings | POSH Awareness Session (Slot-3) |
1.00 | |
| 283 | 2023-08-29 11:07 | Sithan Kumar Palanichamy | Client (External) Meetings | TZ Meeting: TechPRO 24V VCI Development Progress |
1.00 | |
| 284 | 2023-08-29 11:06 | Sithan Kumar Palanichamy | Client (External) Meetings | TVS Meeting: MAHLE TechPRO Warranty Support Details |
1.00 | |
| 285 | 2023-08-29 11:05 | Sithan Kumar Palanichamy | Inter-team Meetings | Location - Go Engage Meeting with IT |
0.50 | |
| 286 | 2023-08-29 10:59 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup of current task updates |
0.50 | |
| 287 | 2023-08-29 10:28 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup of the current task updates |
1.00 | |
| 288 | 2023-08-29 10:26 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU Meeting: Mahindra/DICV/TVS - Backlog Refinements |
1.00 | |
| 289 | 2023-08-29 10:20 | Sithan Kumar Palanichamy | Analysis | Update and share the App release process setup scope understanding document with TVSM |
1.50 | |
| 290 | 2023-08-29 10:19 | Sithan Kumar Palanichamy | Client (External) Meetings | eRidescan App Release Process PPT Analysis and Preparation of Scope of Work Understanding document |
2.00 | |
| 291 | 2023-08-28 18:50 | Pranav Chandrakant Jagajampi | Leave or Permission | Casual leave for personal reason. |
9.00 | |
| 292 | 2023-08-28 18:36 | Pranav Chandrakant Jagajampi | Leave or Permission | Privileges' leave on 2 days... |
18.00 | |
| 293 | 2023-08-28 18:35 | Pranav Chandrakant Jagajampi | Inter-team Meetings | 1. All mahindra PO cross verfied with sameer2. Sent report to sameer3. 32GB pendrive arranged with sameer for reimage DL34. install reimage of DL3 in pendrive and updated to bootable |
9.00 | |
| 294 | 2023-08-18 10:48 | Sithan Kumar Palanichamy | Inter-team Meetings | Coordinated with Tushar on the current status of the OBD2 EVSC topic Techpro Latest Build downloads and upload to a temp. link and shared the build file with DICV (Barani). |
2.00 | |
| 295 | 2023-08-18 10:46 | Sithan Kumar Palanichamy | Inter-team Meetings | Runtime Developer Interview - Primary Java skillset. (Candidate's name is Bhavesh) |
1.00 | |
| 296 | 2023-08-18 10:28 | Sithan Kumar Palanichamy | Analysis | TVSM App Release process - Requirement Analysis to identify the development changes that need to be done in the backend. |
2.00 | |
| 297 | 2023-08-18 10:26 | Sithan Kumar Palanichamy | Client (External) Meetings | TVSM Requirement Meeting - Discussed on eRidescan App release process flow requirement to validate the engineering change or flash file changes by their R&D Team, QAD Team, and Field User. |
1.00 | |
| 298 | 2023-08-18 10:20 | Sithan Kumar Palanichamy | Web Development | 1. Exploring HTML API - Job Workers Services Concept 2. Use Service Workers to manage network requests |
7.00 | |
| 299 | 2023-08-10 10:31 | Sithan Kumar Palanichamy | Leave or Permission | Went to the hospital. |
1.00 | |
| 300 | 2023-08-08 19:54 | Sithan Kumar Palanichamy | Analysis | Check for MSSI Server Expenses and Payments done. |
0.50 | |
| 301 | 2023-08-08 19:51 | Sithan Kumar Palanichamy | Inter-team Meetings | Discussion with Vimal over a telephone conference call for the requirement of a separate staging setup for TVSM QAD team testing and approval. Further Analysis is to be done on the architecture and the estimate. |
0.50 | |
| 302 | 2023-08-07 10:28 | Sithan Kumar Palanichamy | Inter-team Meetings | 1. GTS Meeting with Mohan 2. MSSI/MSSU FB Meeting |
1.00 | |
| 303 | 2023-08-07 10:25 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup of current task updates |
1.00 | |
| 304 | 2023-08-07 10:22 | Sithan Kumar Palanichamy | Client (External) Meetings | GTS - Training meeting with DICV and Mohan. |
1.00 | |
| 305 | 2023-08-07 10:20 | Sithan Kumar Palanichamy | Web Development | DICV guided diagnostic (Ceer Demo) meeting with US team. |
1.00 | |
| 306 | 2023-08-07 10:10 | Sithan Kumar Palanichamy | Inter-team Meetings | GTS Demo Meeting (Ceer) |
1.00 | |
| 307 | 2023-08-02 09:22 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup meeting for current tasks update and discussed escalation topic from DICV. |
1.00 | |
| 308 | 2023-07-31 21:45 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily stand-up meeting for the current task updates |
0.50 | |
| 309 | 2023-07-31 21:36 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily stand-up meeting for the current task updates |
0.50 | |
| 310 | 2023-07-31 21:32 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily Standup meeting for current task updates |
0.75 | |
| 311 | 2023-07-31 20:18 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily standup meeting for current task updates |
0.75 | |
| 312 | 2023-07-31 10:20 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | MSSI AWS Billing Discrepancy: Created a ticket in the AWS console and also sent an email to the MAHLE China team to check it out as we received an email from AWS China support on the over dues. |
1.00 | |
| 313 | 2023-07-31 10:18 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Share bifurcation of consolidated server expenses from Jan'23 to Jun'23 with Manesh |
1.00 | |
| 314 | 2023-07-31 10:17 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | DICV Aftersales Techpro Tool - Creating two login accounts and shared with Tamil |
0.50 | |
| 315 | 2023-07-31 10:09 | Sithan Kumar Palanichamy | Client (External) Meetings | Discussion about streamlining the staging & prod databases of all Ridescan Apps and about building a common database for managing live parameters, DTC list as a repository to make it consistent updates in all Ridescan app backend databases. |
1.00 | |
| 316 | 2023-07-31 10:01 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Resolving the problem of the eRidescan Staging Database table has got locked and being unable to edit it by Vimal. |
1.00 | |
| 317 | 2023-07-28 22:18 | Pranav Chandrakant Jagajampi | Testing | 1. We tested 4 DWVCI 1 in warehouse |
3.00 | |
| 318 | 2023-07-26 10:24 | Sithan Kumar Palanichamy | Leave or Permission | Permission |
1.00 | |
| 319 | 2023-07-26 10:16 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily Stand up for current task updates |
1.00 | |
| 320 | 2023-07-26 09:54 | Vimaladitya Srinivasan | Client (External) Meetings | Internal & External meetinngs |
2.00 | |
| 321 | 2023-07-25 10:56 | Vimaladitya Srinivasan | Inter-team Meetings | Internal meetings |
1.00 | |
| 322 | 2023-07-24 09:05 | Vimaladitya Srinivasan | Inter-team Meetings | Internal status meet |
1.00 | |
| 323 | 2023-07-21 10:34 | Vimaladitya Srinivasan | Inter-team Meetings | Internal Status meeting |
1.00 | |
| 324 | 2023-07-20 18:37 | Sithan Kumar Palanichamy | Inter-team Meetings | MSSU/MSSI FB Meeting |
0.50 | |
| 325 | 2023-07-20 10:34 | Vimaladitya Srinivasan | Inter-team Meetings | Internal Status meet |
1.00 | |
| 326 | 2023-07-20 00:24 | Sithan Kumar Palanichamy | Team Coordination / Technical Support | Technical support to Vimal on eRidescan Database to address the missing data issue with U467+ Model. Analyzed the root cause and added all necessary table data for U467+ vehicle model. |
1.00 | |
| 327 | 2023-07-20 00:03 | Sithan Kumar Palanichamy | Inter-team Meetings | Discussed with Vimal regarding the next steps on the development aspect of the project - DTC First Character Parse logic for BOSCH EMS and also added it to the project list in the timesheet. |
0.50 | |
| 328 | 2023-07-19 23:59 | Sithan Kumar Palanichamy | Inter-team Meetings | Project Hours Record Keeping Meeting with team.Participants: Manesh, Vengat, Gaurav and Nikhil |
0.50 | |
| 329 | 2023-07-19 09:37 | Gauravkumar Badgujar | Analysis | daimler fb analysis and internal meetings with tushar |
7.00 | |
| 330 | 2023-07-18 22:51 | Vimaladitya Srinivasan | Inter-team Meetings | Internal Status meetings |
1.00 | |
| 331 | 2023-07-18 22:51 | Vimaladitya Srinivasan | Client (External) Meetings | PFA.. MOM Points – 18-07-2023 RIDEScan 2W : U489 & U400: Live parameter addition New VCI integration Write Data addition – New VCI integration Vimal to share code snippet RIDEScan 2W 7.5 release: TVS Raider 125 – Cluster Flashing option issue ISG Flash report Plann to release this apk to field today EOD> RIDEScan 2W : VIN Based Flashing Bosch & Keihin associated models readiness & Status Timeline for release Sithan sir to share the API documentation TZ is planning to complete the development & share the APK by 21 first half. RIDEScan 2W : DTC parse logic implementation - ECU manufacturer information Vimal to share the test APK to shankar to test the new DTC parse logic eRIDEScan 2W : SKU Read Implementation & Login API, App version parameter implementation eRIDEScan 2W : U467++ - BMS parameter validation on test bench OBD2 RIDE Scan: IUPR, System Monitoring & Live Data recording dev status for Vitesco, Mikuni & BOSCH Azure Data POSTING readiness Need to freeze the timeline for release TZ to work on Mapping of parameters for Vitesco & Mikuni Vimal to arrange BOSCH EMS, MIKUNI EMS TZ to share APK for BOSCH EMS – IUPR & Live Data recording APK to be shared by tomorrow First half VITESCO EMS – IUPR , Live Data Recording & System Monitoring APK to be shared by second half OBD2 RIDE Scan Final JSON Files : IUPR, System Monitoring & Live Data recording ( with Session_id, VCI firmware version – refer current RIDEScan azure JSON) TZ to share the JSON files by tomorrow second half. Vehicle health report JSON File : Need Final JSON File by EOD. RIDEScan IB : TVS Ronin Vehicle addition |
1.00 | |
| 332 | 2023-07-18 13:10 | Sithan Kumar Palanichamy | Inter-team Meetings | Mahle & TZ - Project Sync-up Meeting:1.RIDEScan 2W : VIN Based Flashing2. RIDEScan 2W : DTC parse logic implementation - ECU manufacturer information3. eRIDE Scan 2W : SKU Read Implementation & Login API, App version parameter implementation4. OBD2 RIDE Scan: IUPR, System Monitoring & Live Data recording dev status for Vitesco Mikuni & BOSCH and Azure Data POSTING readiness5. Vehicle health report JSON File6. RIDEScan IB : TVS Ronin Vehicle addition7. eRIDEScan 2W : U467++ - BMS parameter validation on test bench |
1.00 | |
| 333 | 2023-07-18 12:15 | Sithan Kumar Palanichamy | Inter-team Meetings | Project Hours Record Keeping MeetingParticipants: Manesh, Vengatta, Manoj, Tushar, Sithan, Sameer, Pranav |
1.00 | |
| 334 | 2023-07-18 09:24 | Vimaladitya Srinivasan | Android Development | Internal teams call |
1.00 | |
| 335 | 2023-07-17 23:06 | Sithan Kumar Palanichamy | Testing | Enhancements, Testing, and Bug Fixes on the reports in both user and admin login. |
6.00 | |
| 336 | 2023-07-17 23:02 | Sithan Kumar Palanichamy | Inter-team Meetings | External Visit to collect Laptop |
4.00 | |
| 337 | 2023-07-17 22:44 | Sithan Kumar Palanichamy | Client (External) Meetings | Demo Meeting with TVS Team at Guindy (Chennai) for Ridescan App demo with TVS Jupiter Vehicle about reading generic diagnostic parameters. Mahle Team: Myself, Mr.Manesh, Mr.Vengatta, Mr.RameshTVS Team: Mr.Kameshwaran |
4.50 | |
| 338 | 2023-07-17 20:05 | Sithan Kumar Palanichamy | Inter-team Meetings | Technical Discussion1. VIN Based on Flashing next steps - Discussed the points and showed the API change done for Vin Based flashing.2. DTC parse logic implementation - ECU manufacturer information3. eRIDEScan 2W - Login API, App version parameter implementationParticipants: Myself, Vimal from Mahle and Tamil from Tamilzorous |
2.50 | |
| 339 | 2023-07-17 17:43 | Gauravkumar Badgujar | Inter-team Meetings | status meeting |
1.00 | |
| 340 | 2023-07-17 10:34 | Vimaladitya Srinivasan | Inter-team Meetings | Internal teams calls |
1.00 | |
| 341 | 2023-07-11 12:29 | Vimaladitya Srinivasan | Analysis | Internal status meeting and other project discussions |
2.00 | |
| 342 | 2023-07-11 12:28 | Vimaladitya Srinivasan | Analysis | Internal status meeting |
1.00 | |
| 343 | 2023-07-06 19:51 | Vimaladitya Srinivasan | Android Development | Raider 125 Vehicle addition |
3.00 | |
| 344 | 2023-07-06 19:50 | Vimaladitya Srinivasan | Android Development | 1. DTC First Character Parse Logic change for BOSCH EMS Implementation Analysis2. TVS Ronin ISG Flashing Duration Optimization Implementation Analysis |
4.00 | |
| 345 | 2023-07-06 19:44 | Vimaladitya Srinivasan | Analysis | Meeting with TVS Azure team for implemention of Azure Data logging for eRIDEScan2W, RIDEScan3W & Mini VCI- Preparation of Scope document forTVS Ronin ISG Flashing Duration Optimization-DTC First Character Parse Logic change for BOSCH EMS |
5.00 | |
| 346 | 2023-07-04 09:08 | Sithan Kumar Palanichamy | Inter-team Meetings | Daily Scrum DOM Meetings for daily task activities |
15.00 |