Project Details
Back to List
MSS Activities
In-Progress
In-house Activities

Reports

# Date Created Employee Work Type Task Duration (Hours) Action
1 2025-10-27 18:30 Pranav Chandrakant Jagajampi Leave or Permission

Took a leave for Diwali holidays

27.00
2 2025-09-25 21:09 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

MAHINDRA gate pass renewal procedure done

7.00
3 2025-09-19 21:13 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

IPMB power mode changed from ultra capacitor to battery mode with the help of the US team

4.00
4 2025-09-17 18:06 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

Gate pass renewal is in progress.

3.00
5 2025-09-16 18:47 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. 9 IPMB and Q7 separated.2. List prepared for 11 IPMB in an EXCEL sheet.

8.00
6 2025-09-15 21:27 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. Checked IPMB from the ultra capacitor to the battery mode.2. Regarding OBD cable PO checked with sameer3. Option type updated for W601

9.00
7 2025-09-09 21:10 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. ATP sign-off sheet updated2. Internal online training completed

9.00
8 2025-07-21 18:39 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. After market tool VCI Garage Pro through took trials on Sai Baba TVS2. VCI assembled in MAHLE warehouse

9.00
9 2025-07-09 19:24 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

The IT policy has been updated for MAHLE POWERTRAIN LLC folder

1.00
10 2025-07-08 21:36 Pranav Chandrakant Jagajampi Inter-team Meetings

1. Internal meeting with MSSI2. After-market tool testing discussion3. DL3 part related discussion4. PO follow up

9.00
11 2025-07-03 19:14 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

OS upgradation activity we have done.

9.00
12 2025-06-20 17:23 Pravin Lonkar Client (External) Meetings

Requirement discussion for BMS Flashing sequence modifications and support for modifications.

3.00
13 2025-06-19 22:21 Pranav Chandrakant Jagajampi Leave or Permission

Due to medical emergency took leave

9.00
14 2025-06-02 19:36 Pravin Lonkar Leave or Permission

On Leave

8.00
15 2025-06-02 09:10 Pravin Lonkar Project Documentation

Studied the revised requirement for N600 project, Prepared work efforts estimation.

7.00
16 2025-05-27 18:44 Pranav Chandrakant Jagajampi Inter-team Meetings

1. DL3 Part related discussion

5.00
17 2025-05-12 09:57 Pravin Lonkar Leave or Permission

Personal Leave

9.00
18 2025-05-08 16:00 Pravin Lonkar Client (External) Meetings

Team meeting with TVS team to discuss regarding new requirement of Sedemac EMS address change. Prepared Deleivery scope and Shared with Manesh Sir.

2.00
19 2025-05-07 10:08 Pravin Lonkar Project Documentation

U577 Project requirement study and Efforts estimation preperation.

3.00
20 2025-05-07 09:59 Pravin Lonkar Client (External) Meetings

Discussion with TVS team regarding Cost Breakup for N600 project, Multibinary testing plan, updated the Efforts estimation of N600 as per TVS requirement.

5.00
21 2025-05-05 17:48 Pravin Lonkar Project Documentation

Discussion with TVS team regarding new project requirement for H100. Studied technical Documents and prepared Efforts estimation and Delivery Scope document to share the quotation with TVS team.

7.00
22 2025-04-24 19:51 Pranav Chandrakant Jagajampi Leave or Permission

On personal leave

9.00
23 2025-04-02 09:56 Sithan Kumar Palanichamy Client (External) Meetings

TVS Hosur & Vendor VCI MFG - Order Finalization with customer - 3000 VCI and current project updates and upcoming project discussions.

16.00
24 2025-03-31 19:07 Pravin Lonkar Project Documentation

Prepared Quotation and Work Scope document for requirement of O2 Sensor reading in Hosur and Mysore Plant.

7.00
25 2025-03-31 16:51 Pravin Lonkar Other

Holiday

8.00
26 2025-03-31 12:59 Pravin Lonkar Leave or Permission

On Leave

8.00
27 2025-03-31 11:26 Pravin Lonkar Leave or Permission

on leave

16.00
28 2025-03-28 10:45 Vimaladitya Srinivasan Project Management

1. eRIDE Scan -MCU Flashing issue2. 3W quote3. New Website project 4. Other projects

6.00
29 2025-03-27 08:31 Vimaladitya Srinivasan Project Management

1. Cloud Project2. Other MSSI Activities

4.00
30 2025-03-25 20:44 Vimaladitya Srinivasan Project Management

1. All projects2. Cloud developemnt

6.00
31 2025-03-24 21:12 Vimaladitya Srinivasan Project Management

1. New VCI Projects2. New APK release3. Other activities

6.00
32 2025-03-20 21:04 Vimaladitya Srinivasan Project Management

1. New VCI2. New Project - Website Scope document3. Cloud & AI projects

6.00
33 2025-03-19 18:21 Vimaladitya Srinivasan Android Development

1. New VCI2. New Project - Website Scope document3. Cloud & AI projects

6.00
34 2025-03-19 18:20 Vimaladitya Srinivasan Project Management

All projects

6.00
35 2025-03-17 22:23 Vimaladitya Srinivasan Project Management

1. New VCI Development2. New Project - Analysis: Website Project3. OBD2B

4.00
36 2025-03-13 18:17 Vimaladitya Srinivasan Project Management

1.  New VCI Topic: Pricol – RR310 Cluster report will be given by tomorrow first half Mikuni OBD1 – Report will be given by 15th first half Once the above 2 done, we can consider 90% of the ECU Flashing development is done Keyless ECU Flashing status Vimal to send an email to Ram, requesting for documentation along with query N597 Cluster status Testing in progress BOSCH OBD IIB Tamil to verify the given CAN Logs from EOL team Field Issues XL 100 DTC issue: To be resolved by 15th first half Installation issue: TZ to share the screen record with instructions     6. Aftermarket Evaluation meeting

6.00
37 2025-03-12 20:34 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

Laptop gate pass renewal in MAHINDRA

1.00
38 2025-03-12 20:21 Vimaladitya Srinivasan Project Management

Issues to be addressed: Installation issue BT Disconnection Issue XL 100 DTC issue Keyless ECU Flashing: Mostly by today EOD will be sharing the updated APK OBD2B: Pending: Bosch ECU, Sedemac ECU Flashing N597 Cluster Flashing: Testing in progress at TVS New VCI: Updated the status, will be sharing the report for Mikuni 1 & 2 Karthick may travel on 18th   6. Italy VCI analyisis7. Cloud & AI

6.00
39 2025-03-11 20:34 Vimaladitya Srinivasan Other

Cloud & AI

2.00
40 2025-03-11 20:33 Vimaladitya Srinivasan Project Management

All projects

2.00
41 2025-03-10 21:46 Vimaladitya Srinivasan Project Management

1. New VCI plan2. Other projects

2.00
42 2025-03-07 19:18 Vimaladitya Srinivasan Project Management

1. All projects sync up

2.00
43 2025-03-06 20:24 Vimaladitya Srinivasan Project Management

1. Keyless ECU- Sync up meet and status update2. N597 - Sync up meet and status update3. Billing list creation4. Cloud & AI research

6.00
44 2025-03-05 20:15 Vimaladitya Srinivasan Other

1. Cloud & AI

6.00
45 2025-03-04 20:18 Vimaladitya Srinivasan Project Management

1. New VCI Testing2. IB apk delivery3. SKU Based VCU Flashing 

6.00
46 2025-03-03 18:36 Vimaladitya Srinivasan Project Management

1. VCI testing plan2. Cloud & AI R&D3. eRIDE Scan Release - 5.14. IB Testing & validation

6.00
47 2025-02-28 19:00 Vimaladitya Srinivasan Project Management

All projects 

6.00
48 2025-02-28 19:00 Vimaladitya Srinivasan Project Management

Field level issues: APK installation - play     OBD2B Jupiter vitesco - flashing tested completed Sedemac & Hitachi - flashing testing going on Bosch (raider & 1602v) - App given, testing to be done! Need to have a joint call New VCI Testing To discuss Manesh eRIDEScan 09 Vehicle - Disable VCU flashing based on given SKU SKU Based VCU Flashing Merging Project TZ ready with efforts IB app  - Test link Need to provide a test link for New Ntorq Flash files for Mileage improvement Specifically for Nepal Country. Vehicle ID:82, TVS Ntorq Version 3(Nepal) Model  name: ,New ECU OBD2 -> Button name: NTORQ RE Nepal FE improvement Vehicle ID:88, TVS Ntorq Efi Race XP Model name: , New ECU OBD2 -> Button Name: NTORQ XP Nepal FE improvement IB app - Raider BOSCH OBD2 ECU Flashing issue Need to check with raj

7.00
49 2025-02-28 13:49 Pravin Lonkar Client (External) Meetings

Meeting with TVS team regarding new project requirement.

1.00
50 2025-02-28 13:28 Pravin Lonkar Leave or Permission

Medical Leave

8.00
51 2025-02-27 23:39 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB priority, delivery, and status update

0.50
52 2025-02-26 13:45 Vimaladitya Srinivasan Project Management

eRIDE Scan 09 Vehicle - SKU Based VCU Flashing TZ New VCI Testing Ble Pros: Need data by today EOD Ble testing target date Wi-Fi & USB: OBD2B Jupiter vitesco - flashing tested completed Sedemac & Hitachi - flashing to be done Bosch RTR1602v - App given, testing to be done! N597 Cluster 

6.00
53 2025-02-25 13:09 Vimaladitya Srinivasan Project Management

1. OBD2B BOSCH ECU Flashing - analysis with TVS-TZ- Observations: Seems like new ECU Flashing needs to be developed 2. SKU Based VCU Flashing - quote approved3. eRIDE Scan u546 - testing: discussed with ritika & shivam4. VCI test plan5. Cloud & AI- research

5.00
54 2025-02-24 14:43 Vimaladitya Srinivasan Project Management

1. VCI Testing & Analysis, Coordination TVS-MAHLE-TZ2. Keyless ECU Log file analysis3. Research on Cloud & AI

7.00
55 2025-02-21 14:33 Vimaladitya Srinivasan Project Management

1. VCI testing2. Research - Cloud & AI

6.00
56 2025-02-20 23:12 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB priority, delivery, and status update

0.50
57 2025-02-20 13:38 Vimaladitya Srinivasan Project Management

1. eRIDE Scan -  PFA.. Active login users of staging APK U388 / U546 - Please help us provide the test report at earliest SKU based ECU Flashing – Quote shared to Sunil sir, waiting for your go ahead2. N597 Log file- 3. keyless ECU log file analysis4. Research - Data & AI

6.00
58 2025-02-19 14:27 Vimaladitya Srinivasan Project Management

RIDE Scan 2.0 - Prepare the release Notes IUPR ratio -2 For all the OBD2B Vehicles, need to add this in IUPR list Need to add this in Data Collection Event - Azure as well 7DF & 7E0   IUPR - Intake Air Temperature & MAP Value PID received For All the OBD2B Vehicles 7DF & 7E0   EV Commonization in RIDE Scan 2.0 Need to update by first half   USB-Wi-Fi & BT VCI validation Plan Need to update by first half   OBD2B Vehicle spread sheet update Karthick to update sheet & share it with us   Point Of Contact - hierarchy OBD2B Vehicle list- for Quote Fogbugz -topic

5.00
59 2025-02-19 14:26 Vimaladitya Srinivasan Project Management

ECU Manufacturer/VehicleECU TypeBluetooth WIFIUSBin minutesBoschEMS4.52  VitescoEMS15.33  Cluster -RTRApp4515  MikuniOBD230Tomorrow  SedemacOBD230Tomorrow  MikuniOBD1    

5.00
60 2025-02-19 14:25 Vimaladitya Srinivasan Analysis

Ankit call eRIDE Scan Merge into RIDE Scan - time & cost? Wifi VCI EMS -BOSCH Flashing time? MIKUNI 1 - Flashing time? MIKUNI 2 - Flashing time? USB VCI EMS- BOSCH Flashing time? Mikuni 1 - Flashing time? Mikuni 2 - Flashing time? PPT: Slide 1 : Current Project specs Slide 2: Proposal Regular Customer Independent After market3. Tamil call:- New VCI testing plan- eRIDE Scan merging plan

6.00
61 2025-02-19 00:37 Sithan Kumar Palanichamy Inter-team Meetings

VCI related topic | Queries | TVS-MAHLE

1.00
62 2025-02-13 15:33 Vimaladitya Srinivasan Project Management

1.  Keyless ECU Supplier Meeting DID list & remarks that we noted during the call ECU Flashing: We shared the data mismatch comparison (App simulated log vs CAN Log provided ) , requested accurate PCAN log & ECU Flash file.  2. eRIDE Scan Meeting Vimal to share the latest UAT apk Shivam & Team to test the U546 all diagnostics functions Give MAHLE the test report by 17-02-2025 or so Next sync up call is scheduled on 18-02-2025 Once U546 Is tested, TVS to test U388 Vehicle3. Quotes suggestion  -RTR 160 2V, 180 2V & 160 4V – Connected Cluster Flash- N597 Cluster Diagnostics & Flashing | Scope | Quote | Visteon Cluster

8.00
63 2025-02-13 00:05 Sithan Kumar Palanichamy Inter-team Meetings

Discussed with Vimal to prepare the estimation for the following projects,1. Keyless ECU U7122. Keyless ECU U7133. OBD2 B4. eRidescan SKU Based Flashing

2.00
64 2025-02-12 13:11 Vimaladitya Srinivasan Project Management

1. DTC CODE not visible- Raider Sedemac ECU2. Making VHR it as VAS through TVS Aggregator platform via wallet recharge. 3.  R&D - Data &AI

6.00
65 2025-02-12 13:09 Vimaladitya Srinivasan Analysis

1. SKU based Interlock Software flashing VCU- API2. Scope & Quote discussion U713, OBD2B

5.00
66 2025-02-12 13:08 Vimaladitya Srinivasan Analysis

1. OBD2B Raider EMS 2. Europe eRIDE Scan3. Keyless ECU Flashing CAN Log4. Raider SEdemac ECU- DTC request change

5.00
67 2025-02-11 23:41 Sithan Kumar Palanichamy Inter-team Meetings

Meeting: MAHLE Feedback : Diagnostic tool requirements

1.00
68 2025-02-05 16:48 Vimaladitya Srinivasan Project Management

RIDE Scan 2.0 Xl100 Obd2 flashing issue fixed SKU selection - raider 125 Xl100 detect recovery app Data collection Azure data push enabled.

4.00
69 2025-02-05 16:48 Vimaladitya Srinivasan Analysis

1. Data & AI - Research2. MSSI Projects status, management, etc

6.00
70 2025-02-04 21:01 Sithan Kumar Palanichamy Other

Coordination with TZ regarding Quote for SendGrid & AWS Invoices - January 2025

0.50
71 2025-02-04 20:08 Sithan Kumar Palanichamy Project Management

Prepared and shared January 2025 Engineers Hours Document in the new format shared by Mr. Manesh.

1.00
72 2025-02-03 13:16 Vimaladitya Srinivasan Other

1. Worked on R&D - Data & AI2. Mikuni OBD2 ECU Flashing issue3. Project documentation

8.00
73 2025-01-31 17:47 Vimaladitya Srinivasan Bug Fixing

RIDE Scan 2.0 Bug fixing

6.00
74 2025-01-31 17:46 Vimaladitya Srinivasan Android Development

Keyless ECU - Architecture diagram Pravin to send the flow chart Correlate the data RIDE Scan EU - IUPR Data RIDE Scan EU -05 Vehicle addition 

6.00
75 2025-01-31 17:46 Vimaladitya Srinivasan Application Database Design

1.  Dealt with field issues

4.00
76 2025-01-31 17:41 Vimaladitya Srinivasan Analysis

Project management

4.00
77 2025-01-31 17:41 Vimaladitya Srinivasan Analysis

Research on Data & AI

4.00
78 2025-01-31 17:40 Vimaladitya Srinivasan Analysis

1. Auto VIN Detection Raider Issue - Variant Selection for Specific SKUs2. MIKUNI OBD2 ECU Flashing3. 

4.00
79 2025-01-31 03:59 Sithan Kumar Palanichamy Client (External) Meetings

1. Project Proposal review & clarification meeting with Tamilzorous2. Discussion with the Mahle & Norton team on the new requirement for OES. 

1.00
80 2025-01-31 03:40 Sithan Kumar Palanichamy Leave or Permission

On Permission

2.00
81 2025-01-31 03:31 Sithan Kumar Palanichamy Inter-team Meetings

Ridescan projects  discussion 

0.50
82 2025-01-31 03:27 Sithan Kumar Palanichamy Inter-team Meetings

Virtual Town-hall meeting

1.00
83 2025-01-31 03:01 Sithan Kumar Palanichamy Leave or Permission

Half a day leave

4.00
84 2025-01-31 03:00 Sithan Kumar Palanichamy Leave or Permission

On Leave

8.00
85 2025-01-31 02:53 Sithan Kumar Palanichamy Inter-team Meetings

Ridescan Architecture Understanding discussion with Vimal and Tushar

1.50
86 2025-01-31 02:47 Sithan Kumar Palanichamy Leave or Permission

On year-end privilege leave

48.00
87 2025-01-31 01:50 Sithan Kumar Palanichamy Leave or Permission

First-half leave for the day 

4.00
88 2025-01-31 01:32 Sithan Kumar Palanichamy Inter-team Meetings

1. Welcoming Felix Meeting2. Internal Meeting - MSSI

1.50
89 2025-01-29 17:35 Vimaladitya Srinivasan Other

Data & AI 

2.00
90 2025-01-29 17:34 Vimaladitya Srinivasan Project Documentation

1. Project Management2. Requirement sheet3. Project Overview sheet4. Issues Sheet5. SOP Document

4.00
91 2025-01-29 17:06 Pravin Lonkar Client (External) Meetings

Discussion with Mr. Prabhu from TVS regarding MCU flashing.

1.00
92 2025-01-28 18:29 Sithan Kumar Palanichamy Leave or Permission

On Privilege leave

32.00
93 2025-01-28 18:28 Sithan Kumar Palanichamy Leave or Permission

On Privilege leave

16.00
94 2025-01-28 16:41 Pravin Lonkar Leave or Permission

Half day leave due to medical reason.

4.00
95 2025-01-28 16:36 Pravin Lonkar Project Management

Fogbugz raised for:VAT license renewal for Pravin Lonkar.VAT license renewal for TVS.ReportLogiq license renewal for TVS.

3.00
96 2025-01-28 15:56 Vimaladitya Srinivasan Android Development

Worked on Documentation of SoPInternal meetings, project planning

4.00
97 2025-01-23 04:44 Sithan Kumar Palanichamy Leave or Permission

Took Day-Off for Pongal / Sankranti Festival

8.00
98 2025-01-23 04:41 Sithan Kumar Palanichamy Inter-team Meetings

Discussed with Vimal to identify the CAN vehicle IDPrepare the API documents to share with TusharPrimary API(Contains Vehicle Decoding Information)Secondary API(Contains Vehicle Diagnostics Data)

2.00
99 2025-01-23 04:39 Sithan Kumar Palanichamy Inter-team Meetings

Ridescan Architecture Understanding discussion with Vimal and Tushar.

1.50
100 2025-01-23 04:16 Sithan Kumar Palanichamy Inter-team Meetings

1. MSSU/MSSI - FB Meeting 2. FB 28474 Meeting

0.50
101 2025-01-17 14:16 Vimaladitya Srinivasan Project Management

RIDE Scan 2.0 Issues BOSCH EMS Flashing Issue OPEN 1. Issue observered in RTR 310, RR310, RTR Series 2. BT getting disconnected after Routine Reqeust (Before Erase request) 3. Issue Open date - 15-01-2025 TVS Jupiter VITESCO ECU Flashing  OPEN 1. Need to wait after completing the First region 2. BT abruptly getting disconnected 3.  All BOSCH EMS ConditionsNotCorrect for CVN & CALID  OPEN Log file Firmware Check for 7,8,9 series OPEN   10.6 APK - We need to work on blocking other vehicles except MIKUNI XL100 OBD1?? OPEN   TVS Raider ECU Flashing OPEN 00605415012025125546.txt, XL 100 OBD 1- Old VCI  OPEN 1. Check with TZ, if we can make use of popup to enter VIN Manually. TVS Sport - ECU Flashing status mismatch dashboard/app OPEN   TVS Jupiter VITESCO ECU Flashing  OPEN  

4.00
102 2025-01-16 04:24 Pravin Lonkar Leave or Permission

OFF taken for some urgent personal work.

1.00
103 2025-01-16 04:20 Pravin Lonkar Client (External) Meetings

Discussion with TVS team on ongoing EOL projects timeline, pending PO's and Quotations.

1.00
104 2025-01-14 14:50 Vimaladitya Srinivasan Analysis

Worked on RIDE Scan 2.0.6 - Field Issue, 1) VIN: MD624BE80R2N04381- VIN not found in the TVS VIN database. 2) VIN: MD634BE82P2D02878- Vehicle information could not be fetched from the TVS VIN Attributes JSON file due to mismatched controller type mappings.  - Below are the controller types mapped for this VIN in the TVS VIN Attribute file:    - EMS Controller: BOSCH    - ABS Controller: Conti    - ICU Controller: PRICOL   - In MAHLE Vehicle DB, for the vehicle *TVS APACHE RTR 160 2V RM*, the following controller type mappings were present:    - EMS Controller: BOSCH    - ABS Controller: BOSCH    - ICU Controller: PRICOL  To resolve this, we have updated the mapping by associating the ABS controller Conti with the existing configuration. The vehicle information is now successfully fetching.  3. As requested by Ram & Ankit sir, we have reverted to default OTP(123456) process for Manual Vehicle Selection

4.00
105 2025-01-13 17:41 Vimaladitya Srinivasan Project Management

10.6 Mikuni Flashing: Need to block all the vehicles except for Mikuni-OBD1 Ensure that Sedemac/Keihin Issues   Are you checking for latest Firmware version of 7,8,9 series in RIDE Scan 2.0

4.00
106 2025-01-13 17:40 Vimaladitya Srinivasan Analysis

RIDE Scan Issues: Sedemac & Keihin ECU Flashing Issues: As per Karthick's confirmation, We have guided our CSD (Customer Support Dept) to give 10.6 APK to specific critical dealers till 13-01-2025 We visited dealership on Friday, fixed the Sedemac & Keihin ECU Flashing related issues Shared the APK to Karthick on 11-01-2025 Waiting for TVS feedback to go ahead release this APK to field.   ECU List: Vimal shared the list on 10-01-2025 Waiting for the ECU setup. Keyless ECU Development: MAHLE shared UAT APK along with test report on 10-01-2025, Waiting for feedback from TVS N597 Development: TVS to confirmed that U400 Cluster Flashing sequence/spec document, DTCs list to be followed for N597 Cluster Waiting for the .bin file reading logic Once all data received, MAHLE to share the efforts estimation, timeline. OBD 2B Development: Scheduled a discussion today with Sithan sir & Karthick for Backend API Accommodation Flash Files, CAN Logs, Diagnostics data, Sec Algo -ECU Spec documents -XL100 ES/KS (Needed from TVS) TVS to provide flash files and other pending data We will provide the efforts estimation for the given vehicles/ECUs Development by 14-01-2025 OBD1 Mikuni Issue with 0 series VCI: Work in Progress at MAHLE US Office Will share the exact target date in 1-2 days  

5.00
107 2025-01-09 14:47 Pravin Lonkar Inter-team Meetings

Discussion with MSSU regarding Multi binary implementation.

0.50
108 2025-01-09 04:10 Sithan Kumar Palanichamy Inter-team Meetings

Process improvement discussion for ridescan application and hardware supply- Customer Support Activity, Problem statement and solution- Standard pricing of hardware and software from vendor- New development with MAHLE & Tamilzorous

1.50
109 2025-01-08 16:49 Sithan Kumar Palanichamy Inter-team Meetings

Daily Stand-up meeting of current task updates 

0.50
110 2025-01-08 16:45 Pravin Lonkar Inter-team Meetings

Discussion with Sameer regarding sending invoice copies to Mallamma for project payment initiation.

0.50
111 2025-01-08 13:46 Vimaladitya Srinivasan Analysis

Raider flashing  Sabarwal Auto 1. Temp solution, we have given a build to Ram 2. Need to follow up with Ram 3. Perm. Solution to be discussed and given Raider flashing  14670, (Prabhu TM) 1. Logs analysis started 2. Issue similar to Sabarwal Auto XL 100 issue Siddi vinayak auto Assumption : ECU not responding at AUTO-VIN Detect logic Keihin Flashing   1. Number shared to saddam 2. No support from Toll free number 3. Sameer to check this  ECU setup needed   Raider SEDEMAC OBD I, OBD2, Keihin ECU Customer support 1. CSD follow up is not there 2. Customer support closure is not 3. Wayforward to be decided along with Manesh-Karthick-vimal 4. need to 

5.00
112 2025-01-08 04:59 Sithan Kumar Palanichamy Inter-team Meetings

MSS Technical Resource Alignment within Asia-Pacific discussion with MSS-China team..

1.00
113 2025-01-08 04:57 Sithan Kumar Palanichamy Inter-team Meetings

Discussion on 7 Series VCI Development Cost by inhouse contribution to reduce the vendor costings and software code repository under Mahle from any vendors. 

1.00
114 2025-01-07 17:18 Pravin Lonkar Inter-team Meetings

Meeting with MSS China team for team introduction and business line introduction between India & China team.

1.00
115 2025-01-07 16:24 Vimaladitya Srinivasan Inter-team Meetings

Action items on MSSI: Record keeping for ECRs / Bugs/ New Development Vendor Standard Costing Allocation of work In-house/outsource Outsource costing: Vendor quotation review Pricing of Standard activity related to RIDE Scan development Identify list -vimal

4.00
116 2025-01-06 16:14 Pravin Lonkar Analysis

Study of Kiehin and Sedemec Flash procedures to analyze the work efforts required to implement auto check sum in Kiehin ECU.

1.50
117 2025-01-06 12:24 Vimaladitya Srinivasan Analysis

VIN - "request out of range" / "Service Not Supported" We are internally checking our logic & all other worst case scenarios Scenario 1: Issue occurs during "Manual Vehicle Selection"   OBD 2B: Reviewing the given documents  Working on preparing the requirement spreadsheet, responsibilities, target dates etc.   Keyless ECU Development: ECU setup received and setup done on 03-01-2025 Working on integrating the APIs, can be completed by 08-01-2025 Live parameters, DTCS are working Write data UUID implementation, need clarification from Ram   Compressed PDF: Planning to release the APK by 10-01-2025   Old Application to be blocked: Blocked all the applications, reverifying..   Mikuni OBD1 7 series VCI Topic: In discussion with Karthick on call

4.00
118 2025-01-06 12:11 Pravin Lonkar Other

Collected Non-Domain Laptop from Warehouse for New VAT version installation for Multi binary testing.

1.00
119 2025-01-06 07:16 Sithan Kumar Palanichamy Inter-team Meetings

Discussion with TZ team to discuss the points discussed on TVSM Sync up call.

1.00
120 2025-01-03 13:14 Vimaladitya Srinivasan Analysis

- All Project status analysis

4.00
121 2025-01-03 12:19 Pravin Lonkar Client (External) Meetings

Discussion with TVS team on Issue they are facing with Sedemec OBD-2B Flashing and new requirement for implementing Auto Check Sum Calculation for Sedemec ECU Flashing.

2.00
122 2025-01-03 04:40 Sithan Kumar Palanichamy Other

Talent Cycle Update - Performance and Development Dialogue 2024/2025

1.00
123 2025-01-02 14:44 Sithan Kumar Palanichamy Other

IT Assets Handover from Vengat1. Laptops (1 HP laptop & 1 DELL laptop) with chargers2. One Panasonic Toughbook & its charger3. One iPhone SE4. One VAT Dongle

2.00
124 2025-01-02 14:25 Vimaladitya Srinivasan Inter-team Meetings

Discussed with Sithan - Keyless ECU Development. - Timesheet usage - Upcoming tasks

1.00
125 2025-01-02 13:53 Vimaladitya Srinivasan Inter-team Meetings

1. MSS Project status- TechPRO/RIDE Scan  - 2hrs- Discussed with Manesh - Listed down the projects forecast- Listed down the Billing related activities

2.00
126 2025-01-02 13:35 Pranav Chandrakant Jagajampi Leave or Permission

On leave

54.00
127 2025-01-02 13:05 Pranav Chandrakant Jagajampi Leave or Permission

On leave

9.00
128 2024-12-10 12:30 Pravin Lonkar Leave or Permission

Leave

8.00
129 2024-12-10 12:29 Pravin Lonkar Leave or Permission

Leave

8.00
130 2024-12-10 12:28 Pravin Lonkar Leave or Permission

Leave

8.00
131 2024-11-28 18:50 Pravin Lonkar Leave or Permission

Leave

9.00
132 2024-11-28 18:34 Pravin Lonkar Leave or Permission

Permission - Assembly Election in Maharashtra.

9.00
133 2024-11-28 04:32 Pravin Lonkar Leave or Permission

Leave

9.00
134 2024-10-29 04:19 Pranav Chandrakant Jagajampi Leave or Permission

Personal Leave

18.00
135 2024-10-28 20:30 Sithan Kumar Palanichamy Team Coordination / Technical Support

Coordination & technical support for Mahle Team, TVSM Team & Ridescan development team. (average of 1hours/each day)

24.00
136 2024-10-28 20:27 Sithan Kumar Palanichamy Inter-team Meetings

DOM Meeting - Average 30 minutes per day.

10.00
137 2024-10-28 20:03 Sithan Kumar Palanichamy Team Coordination / Technical Support

EA Migration Activity conducted from Mr. Gulshan from TVSM team. Support given for all ridescan application database server (dev, uat, prod applications) migration activities for the downtime and updating the new configurations in all applications and smoke testing after update.

4.50
138 2024-10-28 05:00 Sithan Kumar Palanichamy Team Coordination / Technical Support

Ridescan DB cutover Discussion with TVSM team (Mr. Gulshan & Team)

0.50
139 2024-10-27 20:18 Pravin Lonkar Client (External) Meetings

Discussion with TVS team on available option to implement the option mod through API.

3.00
140 2024-10-27 20:11 Pravin Lonkar Project Management

Inter-team discussion and option workout for providing solutions for TVS team requirement of OBD-2B PCM_Type option mod implementation through API.

8.00
141 2024-10-27 19:17 Pravin Lonkar Leave or Permission

Leave

8.00
142 2024-10-27 19:15 Pravin Lonkar Leave or Permission

Leave

8.00
143 2024-10-27 18:12 Pravin Lonkar Project Documentation

Efforts estimation preparation for 3W EV database modifications requirement.

6.00
144 2024-10-25 17:39 Pravin Lonkar Project Documentation

Requirements study for EOL 3Wheeler EV database modifications.

7.00
145 2024-09-26 17:28 Pravin Lonkar Project Documentation

Project timesheet update.Project List updation with workhours details.Discussion with TVS Team on Project timeline and PO Status.

8.00
146 2024-09-26 12:23 Pravin Lonkar Project Documentation

Keyless ECU pairing new document study

8.00
147 2024-09-26 12:12 Pravin Lonkar Client (External) Meetings

Discussion with TVS team regarding new project requirement for 3W EV.

2.00
148 2024-09-26 12:09 Pravin Lonkar Client (External) Meetings

Discussion with TVS Team for PEPS Keyless ECU Pairing.

2.00
149 2024-09-26 11:08 Pravin Lonkar Project Documentation

Bosch ECU address change requirement study, Efforts estimation preparation and testing support.

8.00
150 2024-09-03 15:20 Pranav Chandrakant Jagajampi Leave or Permission

On personal leave

9.00
151 2024-09-03 15:19 Pranav Chandrakant Jagajampi Leave or Permission

Personal leave

9.00
152 2024-09-03 15:12 Pranav Chandrakant Jagajampi Other

MSS Training completed

2.00
153 2024-08-18 13:19 Pravin Lonkar Project Documentation

Revised Efforts estimation and delivery scope documents for ICM ABS, U711 and Mult binary projects as per TVS requirements.

7.00
154 2024-08-18 13:12 Pravin Lonkar Project Documentation

Keyless ECU pairing and Diagnostic requirements study and Efforts estimation & Scope document preparation.

7.00
155 2024-08-18 13:01 Pravin Lonkar Project Management

TVS EOL project sheet updation.

2.00
156 2024-08-18 12:59 Pravin Lonkar Client (External) Meetings

Discussion with TVS team on New projects(U712/U713 Keyless feature implementation) requirements.

1.00
157 2024-08-14 07:06 Pranav Chandrakant Jagajampi Other

1. Gate pass renewal procedure done

5.00
158 2024-08-14 07:04 Pranav Chandrakant Jagajampi Other

1. Gate pass renewal procedure started compliance sign taken

3.00
159 2024-08-14 07:00 Pranav Chandrakant Jagajampi Other

1. Gate pass renewal documents collected from MAHLE office

3.00
160 2024-07-29 04:05 Pravin Lonkar Leave or Permission

Leave

9.00
161 2024-07-29 04:04 Pravin Lonkar Leave or Permission

Leave

9.00
162 2024-07-20 15:27 Pranav Chandrakant Jagajampi Leave or Permission

On leave

9.00
163 2024-07-20 15:15 Pranav Chandrakant Jagajampi Client (External) Meetings

1. Vector free session did

4.00
164 2024-07-20 15:07 Pranav Chandrakant Jagajampi Leave or Permission

On leave

9.00
165 2024-07-01 04:22 Pravin Lonkar Project Documentation

DLX requirement document and Workhours effort estimation document & Delivery scope document preparation for U400 project new requirement of TPMS default value writing &IMU sequence change.

7.00
166 2024-07-01 03:14 Pravin Lonkar Project Documentation

Work efforts estimation and Delivery Scope document preparation for new requirement in BMW U400 line.

7.00
167 2024-07-01 02:34 Pravin Lonkar Client (External) Meetings

Meeting with TZ pvt lts to discuss the features of TechPRO VCI. 

1.00
168 2024-06-28 10:20 Pravin Lonkar Client (External) Meetings

Discussion Tamil Zorus team, Study of Techinical specification for 24V TechPRO VCI shared by TZ pvt ltd.

4.00
169 2024-06-28 07:14 Pranav Chandrakant Jagajampi Other

1. Laptop gatepass renwal

3.00
170 2024-06-28 07:01 Pranav Chandrakant Jagajampi Leave or Permission

Sick leave with permission

9.00
171 2024-06-28 04:20 Pravin Lonkar Leave or Permission

Leave

8.00
172 2024-06-28 04:19 Pravin Lonkar Leave or Permission

Leave

8.00
173 2024-06-18 08:06 Pravin Lonkar Client (External) Meetings

Collected VCI's from Warehouse.

3.00
174 2024-06-18 08:04 Pravin Lonkar Client (External) Meetings

MSS EOL products (VCI, EOL Tool Chain) presentation in Tata Motors.

5.00
175 2024-06-18 08:02 Pravin Lonkar Client (External) Meetings

Daily Tasks Updates.

1.00
176 2024-06-18 08:00 Pravin Lonkar Project Documentation

Work out on Standard work hours calculation as per TVS requirements.

4.00
177 2024-06-12 15:48 Pravin Lonkar Project Documentation

Work out on Standard work hours calculation as per TVS requirements.

3.00
178 2024-06-11 17:24 Pravin Lonkar Project Documentation

Listing out Standard test and its Subtasks for preparation of Standard pricing quotation for TVS Motors.

7.00
179 2024-05-28 04:27 Pravin Lonkar Project Documentation

Proposal Documentation for TVS new requirement of multiple binary handling logic. 

7.00
180 2024-05-25 07:34 Pranav Chandrakant Jagajampi Testing

1. 24V VCI checked with new firmware updation software2. Q7 Invoice submitted to H block

2.00
181 2024-05-22 14:17 Pravin Lonkar Leave or Permission

Leave

0.00
182 2024-05-17 11:27 Pravin Lonkar Project Documentation

Work hours estimation & Scope of Work document preparation for Sedemac Phase-2, Sedemac OBD-II SENSORS ADDITION, KEIHIN Actuators addition.

7.00
183 2024-05-17 11:22 Pravin Lonkar Inter-team Meetings

Inter team discussion in multiple binary handling in one runtime.

0.50
184 2024-05-17 11:19 Pravin Lonkar Client (External) Meetings

Discussion with TVS team on Ongoing projects & New projects costing.

0.50
185 2024-05-15 12:45 Pranav Chandrakant Jagajampi Leave or Permission

Sick leave

9.00
186 2024-05-15 12:44 Pranav Chandrakant Jagajampi Leave or Permission

Due to the election in the MAHLE office official leave announced.

9.00
187 2024-05-07 04:51 Sithan Kumar Palanichamy Leave or Permission

On Leave

8.00
188 2024-05-06 16:18 Pravin Lonkar Project Documentation

Project Work hours estimation for MCU station interlocking in VCU station.Delivery Scope Document Preparation for VCU Station modifications. 

7.00
189 2024-05-06 04:24 Pravin Lonkar Client (External) Meetings

Meeting with TVS team regarding Sedemac Phase 2 EOL development requirements. 

1.00
190 2024-04-29 04:12 Pravin Lonkar Leave or Permission

Leave

9.00
191 2024-04-28 05:31 Pranav Chandrakant Jagajampi Inter-team Meetings

Daily meeting

10.00
192 2024-04-28 05:28 Pranav Chandrakant Jagajampi Analysis

1. Report Logiq data coming or not checked2. ECU id not shown in PBF file log file raise FB3. Tech Pro 24V VCI checked and send report to tushar and vengat

9.00
193 2024-04-28 05:13 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. 8 VCI firmware updated2. 8 VCI checked3. DL3 3031 tried to follow steps as per jim but still solution not meet

9.00
194 2024-04-28 05:02 Pranav Chandrakant Jagajampi Leave or Permission

Taken casual leave.

9.00
195 2024-04-28 03:21 Pranav Chandrakant Jagajampi Inter-team Meetings

Daily meeting

8.00
196 2024-04-28 03:20 Pranav Chandrakant Jagajampi Inter-team Meetings

Daily meeting

9.00
197 2024-04-28 03:15 Pranav Chandrakant Jagajampi Leave or Permission

On leave

27.00
198 2024-04-27 11:50 Pranav Chandrakant Jagajampi Leave or Permission

Taken comp off leave

9.00
199 2024-04-27 09:17 Pranav Chandrakant Jagajampi Leave or Permission

Taken Comp off

9.00
200 2024-04-27 08:21 Pranav Chandrakant Jagajampi Leave or Permission

Taken Comp off

9.00
201 2024-04-27 08:06 Pranav Chandrakant Jagajampi Other

Final excel sheet sent to team regarding VAT License updation

1.00
202 2024-04-27 08:02 Pranav Chandrakant Jagajampi Inter-team Meetings

Daily internal teams meeting

11.00
203 2024-04-27 07:57 Pranav Chandrakant Jagajampi Other

Fogbugz updated for BAJAJ VAT license file

1.00
204 2024-04-27 07:56 Pranav Chandrakant Jagajampi Project Documentation

VAT license and RL license excel sheet updated

2.00
205 2024-04-21 03:05 Pravin Lonkar Analysis

Study of N597 project Requirement.

8.00
206 2024-04-20 11:45 Pravin Lonkar Project Documentation

Effort Estimation & delivery scope document prepared for U490 Project.

8.00
207 2024-04-19 10:00 Pravin Lonkar Other

 VAT Training to Prabhakaran.

2.00
208 2024-01-23 19:34 Sithan Kumar Palanichamy Other

License Portal Fixes

4.50
209 2024-01-03 18:13 Pranav Chandrakant Jagajampi Inter-team Meetings

MAHLE internal meeting with MSS team

9.00
210 2024-01-03 18:13 Pranav Chandrakant Jagajampi Inter-team Meetings

MAHLE internal meeting with MSS team

9.00
211 2023-11-29 21:10 Pranav Chandrakant Jagajampi Leave or Permission

Personal Leave

27.00
212 2023-11-02 20:22 Pranav Chandrakant Jagajampi Inter-team Meetings

Internal DOM meeting

10.00
213 2023-11-02 20:09 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. OS issue on new laptop checked with MAHLE IT

9.00
214 2023-11-02 20:02 Pranav Chandrakant Jagajampi Team Coordination / Technical Support

1. Old laptop given for check blue dump issue2. Two old laptop given for OS installation to IT team3. Data keep in backup in share drive

9.00
215 2023-11-02 19:48 Pranav Chandrakant Jagajampi Leave or Permission

Personal leave

18.00
216 2023-11-02 10:26 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting: Website <> Mahle Testing - Regarding how the cluster upgrade flow works from the point of purchasing the cluster feature from the TVSM website till the Order is captured in Mahle DMS.

2.00
217 2023-11-02 10:24 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting: Consolidation of Staging APKs in TVSM + Regularization of  APK / ASW File Approval Process for eRide Scan Mobile App

1.00
218 2023-11-02 10:22 Sithan Kumar Palanichamy Inter-team Meetings

MSSU Meeting: Mahindra/DICV/TVS - Backlog refinement

0.50
219 2023-11-02 10:20 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting: Discussion to introduce U388 project to MAHLE by Mr.Gurusekar.

1.50
220 2023-11-02 10:19 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting: Discussion and closure of open points for diagnostic tool development.  

1.00
221 2023-11-01 09:57 Sithan Kumar Palanichamy Other

Paid Holiday - Dussehra 

8.00
222 2023-11-01 09:56 Sithan Kumar Palanichamy Leave or Permission

On Personal Leave

8.00
223 2023-11-01 09:56 Sithan Kumar Palanichamy Other

Paid Holiday

8.00
224 2023-10-13 10:44 Sithan Kumar Palanichamy Client (External) Meetings

Mahindra Meeting:Weekly Review - M&M DoIP Development 

1.00
225 2023-10-13 10:19 Sithan Kumar Palanichamy Other

Interview Android Developer - Mohammed Umar

0.50
226 2023-10-13 10:18 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting - U400 Diagnostic tool and vehicle health report

0.75
227 2023-10-13 10:16 Sithan Kumar Palanichamy Client (External) Meetings

TZ-Mahle Sync up meeting with Vimal and Tamil to discuss the current status of all TVSM projects assigned.

1.00
228 2023-10-13 10:05 Sithan Kumar Palanichamy Analysis

Analysis of the existing cluster upgrade feature in Ridescan for the feasibility of scaling it up and checking the level of changes required to extend the cluster upgrade functionality. 

2.00
229 2023-10-13 10:00 Sithan Kumar Palanichamy Team Coordination / Technical Support

Discussion with Vimal on the cluster upgrade feature implemented in Ridescan in order to understand the new development for RTR310 accessories. 

2.00
230 2023-10-13 09:58 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting - RTR310 accessories (web creation for software payment + DMS integration)

1.00
231 2023-10-03 19:21 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB Priority, Delivery and Current status update meeting

0.50
232 2023-10-03 19:20 Sithan Kumar Palanichamy Inter-team Meetings

24V VCI Technical Discussion

1.00
233 2023-10-03 19:19 Sithan Kumar Palanichamy Client (External) Meetings

MAHLE - TZ Sync up call for the current status of the TVSM projects

1.50
234 2023-10-03 19:12 Sithan Kumar Palanichamy Other

1) MSSI AWS Server Maintenance - Extended Disk storage2) Installed and Enabled Composer - an application-level dependency manager for the PHP programming language to download and enable PHPMailer package to test the SMTP mode of email sending.

2.00
235 2023-10-03 19:10 Sithan Kumar Palanichamy Leave or Permission

Permission

2.00
236 2023-10-03 19:08 Sithan Kumar Palanichamy Project Management

Pulling the latest list of all active FB Tickets of Daimler and prioritization.

1.00
237 2023-10-03 18:57 Sithan Kumar Palanichamy Other

Holiday on the occasion of Ganesh Chaturthi Festival.

8.00
238 2023-10-03 18:47 Sithan Kumar Palanichamy Inter-team Meetings

Mahindra/DICV/TVS - Backlog refinements meeting

0.25
239 2023-10-03 18:47 Sithan Kumar Palanichamy Inter-team Meetings

Location Go-Engage Meeting with IT team

0.25
240 2023-10-03 18:45 Sithan Kumar Palanichamy Team Coordination / Technical Support

Technical Support was given to Yash (Bajaj) remote for CDMT JSON push to Truimph PCs.

2.00
241 2023-10-03 18:33 Sithan Kumar Palanichamy Project Management

Exported FB tickets and reviewed the open tickets for prioritization. 

1.50
242 2023-10-03 18:15 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB Priority, Delivery and Status Update Meeting

0.50
243 2023-10-03 18:14 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting on the U400 Diagnostic tool development.

1.00
244 2023-10-03 18:12 Sithan Kumar Palanichamy Team Coordination / Technical Support

Coordinated with Vimal on the cluster upgrade and provided the details for a discussion with TVSM on a similar integration project.

1.00
245 2023-10-03 17:45 Sithan Kumar Palanichamy Client (External) Meetings

MAHLE & Tamilzorous sync up call for the project status.

0.50
246 2023-10-03 17:44 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting on U400 Diagnostic Tool Development

1.00
247 2023-10-03 17:39 Sithan Kumar Palanichamy Team Coordination / Technical Support

Coordination with Gaurav on the OES Password Reset Issue.

1.00
248 2023-10-03 12:51 Sithan Kumar Palanichamy Client (External) Meetings

TechPRO 24V VCI Development Progress1) Current status of manufacturing 24v sample units2) Current status of software integration3) Escalation point for immediate assistance4) Action items

1.50
249 2023-10-03 10:29 Sithan Kumar Palanichamy Client (External) Meetings

TVSM - iQube Diagnostic tool development meeting.

1.00
250 2023-10-03 10:26 Sithan Kumar Palanichamy Inter-team Meetings

Mahindra/DICV/TVS - Backlog refinements meeting with MSSU.

0.50
251 2023-10-03 10:25 Sithan Kumar Palanichamy Team Coordination / Technical Support

Coordination/Discussion with Gaurav on the following points:Password ResetRestriction of EMS ECU Replacement Feature if flashing has not been done.

1.00
252 2023-10-03 10:19 Sithan Kumar Palanichamy Other

Coordinated with the Bajaj IT Team for password reset and troubleshooting the VPN connection issue.

3.00
253 2023-10-03 10:16 Sithan Kumar Palanichamy Inter-team Meetings

Program Management Meeting

0.50
254 2023-10-03 10:04 Sithan Kumar Palanichamy Inter-team Meetings

Internal discussion with Vengat and Gaurav on the reference name used for V305 flashing. (BSVI_Engine_OBD2_V305) 

1.00
255 2023-10-03 09:58 Sithan Kumar Palanichamy Inter-team Meetings

MAHLE & TZ - Sync up Call - Discussed all the project's current development status that are assigned to the TZ team.   

1.50
256 2023-10-03 09:50 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB Priority, Delivery and Status Update

1.00
257 2023-10-03 09:47 Sithan Kumar Palanichamy Client (External) Meetings

Discussion on Ridescan Urgent Projects: Delivery Status: U489 : Flashing U489 : Vehicle health report 3W eRidescan 3w Other project

1.00
258 2023-10-03 09:45 Sithan Kumar Palanichamy Inter-team Meetings

1) Coordinated with Vimal to check and updated him the Flashing file was not pulled for U467++ due to incorrect mapping. 2) Updating the RTR310 vehicle image in the backend server.

1.00
259 2023-09-29 12:56 Pranav Chandrakant Jagajampi Other

1. Timesheet fillup2. DL3 tracker updated3. Visit report created

7.00
260 2023-09-28 15:05 Pranav Chandrakant Jagajampi Bug Fixing

1. Waiting for approval from IT side to install all programs which i required2. Admin rights  not provided to MSS_install folder

9.00
261 2023-09-28 15:04 Pranav Chandrakant Jagajampi Bug Fixing

1. Laptop collected2. Recovered data

9.00
262 2023-09-28 15:03 Pranav Chandrakant Jagajampi Bug Fixing

1. Kept data in backup2. Laptop handover to IT team

9.00
263 2023-09-07 10:01 Sithan Kumar Palanichamy Other

Interview Session for senior developer position - Sachin Chivate

1.00
264 2023-09-07 10:00 Sithan Kumar Palanichamy Other

Interview Session for senior developer position - Jagadeesh Pal

1.00
265 2023-09-07 09:59 Sithan Kumar Palanichamy Client (External) Meetings

RIDE Scan 3W-DMS 2.2 app R&D testing feedback for -Reg - Conversion factor updation input

1.00
266 2023-09-07 09:58 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting - iQube Diagnostic tool development: Discussion & closure of open points for diagnostic tool development.

1.00
267 2023-09-07 09:25 Sithan Kumar Palanichamy Other

Timesheet update for August

1.00
268 2023-09-07 09:13 Sithan Kumar Palanichamy Inter-team Meetings

1) Coordinated with Vimal on U489 TPMS communication from TVSM2) Discussed with Vimal & Tamil on Mikuni FB update 

1.50
269 2023-09-07 09:09 Sithan Kumar Palanichamy Inter-team Meetings

Program Management Meeting

1.00
270 2023-09-01 10:22 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB Priority, Delivery and Status Update meeting

0.50
271 2023-09-01 10:18 Sithan Kumar Palanichamy Analysis

DICV FogBugz Review on pending activities.

2.00
272 2023-09-01 10:05 Sithan Kumar Palanichamy Team Coordination / Technical Support

Coordination with the team and support are given to Tushar and the DICV team on the build release.

2.00
273 2023-09-01 09:13 Sithan Kumar Palanichamy Client (External) Meetings

TechPRO 24V VCI Development Progress Meeting

1.00
274 2023-09-01 09:12 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Meeting: iQube Diagnostic tool development

1.00
275 2023-08-31 14:58 Pranav Chandrakant Jagajampi Inter-team Meetings

1. Discussed regarding MAHINDRA activities2. Laptop related issue shown to Shrikant

9.00
276 2023-08-30 10:18 Sithan Kumar Palanichamy Team Coordination / Technical Support

Coordination with Tushar: 1. To release the latest build by downloading through a temporary server link. 2. New ECU ID info for the Rapid prime Tool for INS parameterization

1.00
277 2023-08-30 10:06 Sithan Kumar Palanichamy Inter-team Meetings

Daily stand up of the current task updates

1.00
278 2023-08-29 11:26 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI - FB Priority, Delivery and Status update 

1.00
279 2023-08-29 11:23 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup of the current task updates

0.75
280 2023-08-29 11:20 Sithan Kumar Palanichamy Client (External) Meetings

DICV Meeting: HDT Platform Overview - DICV Explanation

1.00
281 2023-08-29 11:19 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup of the current task updates

0.50
282 2023-08-29 11:13 Sithan Kumar Palanichamy Inter-team Meetings

POSH Awareness Session (Slot-3) 

1.00
283 2023-08-29 11:07 Sithan Kumar Palanichamy Client (External) Meetings

TZ Meeting: TechPRO 24V VCI Development Progress

1.00
284 2023-08-29 11:06 Sithan Kumar Palanichamy Client (External) Meetings

TVS Meeting: MAHLE TechPRO Warranty Support Details

1.00
285 2023-08-29 11:05 Sithan Kumar Palanichamy Inter-team Meetings

Location - Go Engage Meeting with IT

0.50
286 2023-08-29 10:59 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup of current task updates

0.50
287 2023-08-29 10:28 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup of the current task updates

1.00
288 2023-08-29 10:26 Sithan Kumar Palanichamy Inter-team Meetings

MSSU Meeting: Mahindra/DICV/TVS - Backlog Refinements

1.00
289 2023-08-29 10:20 Sithan Kumar Palanichamy Analysis

Update and share the App release process setup scope understanding document with TVSM

1.50
290 2023-08-29 10:19 Sithan Kumar Palanichamy Client (External) Meetings

eRidescan App Release Process PPT Analysis and Preparation of Scope of Work Understanding document

2.00
291 2023-08-28 18:50 Pranav Chandrakant Jagajampi Leave or Permission

Casual leave for personal reason.

9.00
292 2023-08-28 18:36 Pranav Chandrakant Jagajampi Leave or Permission

Privileges' leave on 2 days...

18.00
293 2023-08-28 18:35 Pranav Chandrakant Jagajampi Inter-team Meetings

1. All mahindra PO cross verfied with sameer2. Sent report to sameer3. 32GB pendrive arranged with sameer for reimage DL34. install reimage of DL3 in pendrive and updated to bootable

9.00
294 2023-08-18 10:48 Sithan Kumar Palanichamy Inter-team Meetings

Coordinated with Tushar on the current status of the OBD2 EVSC topic Techpro Latest Build downloads and upload to a temp. link and shared the build file with DICV (Barani).

2.00
295 2023-08-18 10:46 Sithan Kumar Palanichamy Inter-team Meetings

Runtime Developer Interview - Primary Java skillset. (Candidate's name is Bhavesh) 

1.00
296 2023-08-18 10:28 Sithan Kumar Palanichamy Analysis

TVSM App Release process - Requirement Analysis to identify the development changes that need to be done in the backend. 

2.00
297 2023-08-18 10:26 Sithan Kumar Palanichamy Client (External) Meetings

TVSM Requirement Meeting - Discussed on eRidescan App release process flow requirement to validate the engineering change or flash file changes by their R&D Team, QAD Team, and Field User.

1.00
298 2023-08-18 10:20 Sithan Kumar Palanichamy Web Development

1. Exploring HTML API - Job Workers Services Concept 2. Use Service Workers to manage network requests

7.00
299 2023-08-10 10:31 Sithan Kumar Palanichamy Leave or Permission

Went to the hospital.

1.00
300 2023-08-08 19:54 Sithan Kumar Palanichamy Analysis

Check for MSSI Server Expenses and Payments done. 

0.50
301 2023-08-08 19:51 Sithan Kumar Palanichamy Inter-team Meetings

Discussion with Vimal over a telephone conference call for the requirement of a separate staging setup for TVSM QAD team testing and approval. Further Analysis is to be done on the architecture and the estimate.

0.50
302 2023-08-07 10:28 Sithan Kumar Palanichamy Inter-team Meetings

1. GTS Meeting with Mohan 2. MSSI/MSSU FB Meeting

1.00
303 2023-08-07 10:25 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup of current task updates

1.00
304 2023-08-07 10:22 Sithan Kumar Palanichamy Client (External) Meetings

GTS - Training meeting with DICV and Mohan.

1.00
305 2023-08-07 10:20 Sithan Kumar Palanichamy Web Development

DICV guided diagnostic (Ceer Demo) meeting with US team.

1.00
306 2023-08-07 10:10 Sithan Kumar Palanichamy Inter-team Meetings

GTS Demo Meeting (Ceer)

1.00
307 2023-08-02 09:22 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup meeting for current tasks update and discussed escalation topic from DICV. 

1.00
308 2023-07-31 21:45 Sithan Kumar Palanichamy Inter-team Meetings

Daily stand-up meeting for the current task updates

0.50
309 2023-07-31 21:36 Sithan Kumar Palanichamy Inter-team Meetings

Daily stand-up meeting for the current task updates

0.50
310 2023-07-31 21:32 Sithan Kumar Palanichamy Inter-team Meetings

Daily Standup meeting for current task updates

0.75
311 2023-07-31 20:18 Sithan Kumar Palanichamy Inter-team Meetings

Daily standup meeting for current task updates

0.75
312 2023-07-31 10:20 Sithan Kumar Palanichamy Team Coordination / Technical Support

MSSI AWS Billing Discrepancy: Created a ticket in the AWS console and also sent an email to the MAHLE China team to check it out as we received an email from AWS China support on the over dues.  

1.00
313 2023-07-31 10:18 Sithan Kumar Palanichamy Team Coordination / Technical Support

Share bifurcation of consolidated server expenses from Jan'23 to Jun'23 with Manesh

1.00
314 2023-07-31 10:17 Sithan Kumar Palanichamy Team Coordination / Technical Support

DICV Aftersales Techpro Tool - Creating two login accounts and shared with Tamil

0.50
315 2023-07-31 10:09 Sithan Kumar Palanichamy Client (External) Meetings

Discussion about streamlining the staging & prod databases of all Ridescan Apps and about building a common database for managing live parameters, DTC list as a repository to make it consistent updates in all Ridescan app backend databases.

1.00
316 2023-07-31 10:01 Sithan Kumar Palanichamy Team Coordination / Technical Support

Resolving the problem of the eRidescan Staging Database table has got locked and being unable to edit it by Vimal. 

1.00
317 2023-07-28 22:18 Pranav Chandrakant Jagajampi Testing

1. We tested 4 DWVCI 1 in warehouse

3.00
318 2023-07-26 10:24 Sithan Kumar Palanichamy Leave or Permission

Permission 

1.00
319 2023-07-26 10:16 Sithan Kumar Palanichamy Inter-team Meetings

Daily Stand up for current task updates

1.00
320 2023-07-26 09:54 Vimaladitya Srinivasan Client (External) Meetings

Internal & External meetinngs

2.00
321 2023-07-25 10:56 Vimaladitya Srinivasan Inter-team Meetings

Internal meetings

1.00
322 2023-07-24 09:05 Vimaladitya Srinivasan Inter-team Meetings

Internal status meet

1.00
323 2023-07-21 10:34 Vimaladitya Srinivasan Inter-team Meetings

Internal Status meeting

1.00
324 2023-07-20 18:37 Sithan Kumar Palanichamy Inter-team Meetings

MSSU/MSSI FB Meeting

0.50
325 2023-07-20 10:34 Vimaladitya Srinivasan Inter-team Meetings

Internal Status meet

1.00
326 2023-07-20 00:24 Sithan Kumar Palanichamy Team Coordination / Technical Support

Technical support to Vimal on eRidescan Database to address the missing data issue with U467+ Model. Analyzed the root cause and added all necessary table data for U467+ vehicle model.   

1.00
327 2023-07-20 00:03 Sithan Kumar Palanichamy Inter-team Meetings

Discussed with Vimal regarding the next steps on the development aspect of the project - DTC First Character Parse logic for BOSCH EMS and also added it to the project list in the timesheet.

0.50
328 2023-07-19 23:59 Sithan Kumar Palanichamy Inter-team Meetings

Project Hours Record Keeping Meeting with team.Participants: Manesh, Vengat, Gaurav and Nikhil

0.50
329 2023-07-19 09:37 Gauravkumar Badgujar Analysis

daimler fb analysis and internal meetings with tushar

7.00
330 2023-07-18 22:51 Vimaladitya Srinivasan Inter-team Meetings

Internal Status meetings

1.00
331 2023-07-18 22:51 Vimaladitya Srinivasan Client (External) Meetings

PFA.. MOM Points – 18-07-2023 RIDEScan 2W : U489 & U400: Live parameter addition New VCI integration             Write Data addition – New VCI integration Vimal to share code snippet RIDEScan 2W 7.5 release: TVS Raider 125 – Cluster Flashing option issue ISG Flash report Plann to release this apk to field today EOD> RIDEScan 2W : VIN Based Flashing Bosch & Keihin associated models readiness & Status  Timeline for release Sithan sir to share the API documentation TZ is planning to complete the development & share the APK by 21 first half. RIDEScan 2W : DTC parse logic implementation - ECU manufacturer information  Vimal to share the test APK to shankar to test the new DTC parse logic eRIDEScan 2W : SKU Read Implementation &  Login API, App version parameter implementation  eRIDEScan 2W : U467++ - BMS parameter validation on test bench OBD2 RIDE Scan: IUPR, System Monitoring & Live Data recording dev status for Vitesco, Mikuni & BOSCH Azure Data POSTING readiness Need to freeze the timeline for release TZ to work on Mapping of parameters for Vitesco & Mikuni Vimal to arrange BOSCH EMS, MIKUNI EMS TZ to share APK for BOSCH EMS – IUPR & Live Data recording APK to be shared by tomorrow First half VITESCO EMS – IUPR , Live Data Recording & System Monitoring  APK to be shared by second half OBD2 RIDE Scan Final JSON Files : IUPR, System Monitoring & Live Data recording ( with Session_id, VCI firmware version – refer current RIDEScan azure JSON) TZ to share the JSON files by tomorrow second half. Vehicle health report  JSON File : Need Final JSON File by EOD. RIDEScan IB : TVS Ronin Vehicle addition

1.00
332 2023-07-18 13:10 Sithan Kumar Palanichamy Inter-team Meetings

Mahle & TZ - Project Sync-up Meeting:1.RIDEScan 2W : VIN Based Flashing2. RIDEScan 2W : DTC parse logic implementation - ECU manufacturer information3. eRIDE Scan 2W : SKU Read Implementation &  Login API, App version parameter implementation4. OBD2 RIDE Scan: IUPR, System Monitoring & Live Data recording dev status for Vitesco Mikuni & BOSCH and Azure Data POSTING readiness5. Vehicle health report  JSON File6. RIDEScan IB : TVS Ronin Vehicle addition7. eRIDEScan 2W : U467++ - BMS parameter validation on test bench

1.00
333 2023-07-18 12:15 Sithan Kumar Palanichamy Inter-team Meetings

Project Hours Record Keeping MeetingParticipants: Manesh, Vengatta, Manoj, Tushar, Sithan, Sameer, Pranav

1.00
334 2023-07-18 09:24 Vimaladitya Srinivasan Android Development

Internal teams call

1.00
335 2023-07-17 23:06 Sithan Kumar Palanichamy Testing

Enhancements, Testing, and Bug Fixes on the reports in both user and admin login.

6.00
336 2023-07-17 23:02 Sithan Kumar Palanichamy Inter-team Meetings

External Visit to collect Laptop

4.00
337 2023-07-17 22:44 Sithan Kumar Palanichamy Client (External) Meetings

Demo Meeting with TVS Team at Guindy (Chennai) for Ridescan App demo with TVS Jupiter Vehicle about reading generic diagnostic parameters. Mahle Team: Myself, Mr.Manesh, Mr.Vengatta, Mr.RameshTVS Team: Mr.Kameshwaran

4.50
338 2023-07-17 20:05 Sithan Kumar Palanichamy Inter-team Meetings

Technical Discussion1. VIN Based on Flashing next steps - Discussed the points and showed the API change done for Vin Based flashing.2. DTC parse logic implementation - ECU manufacturer information3. eRIDEScan 2W - Login API, App version parameter implementationParticipants: Myself, Vimal from Mahle and Tamil from Tamilzorous

2.50
339 2023-07-17 17:43 Gauravkumar Badgujar Inter-team Meetings

status meeting

1.00
340 2023-07-17 10:34 Vimaladitya Srinivasan Inter-team Meetings

Internal teams calls

1.00
341 2023-07-11 12:29 Vimaladitya Srinivasan Analysis

Internal status meeting and other project discussions

2.00
342 2023-07-11 12:28 Vimaladitya Srinivasan Analysis

Internal status meeting

1.00
343 2023-07-06 19:51 Vimaladitya Srinivasan Android Development

Raider 125 Vehicle addition

3.00
344 2023-07-06 19:50 Vimaladitya Srinivasan Android Development

1. DTC First Character Parse Logic change for BOSCH EMS Implementation Analysis2. TVS Ronin ISG Flashing Duration Optimization Implementation Analysis

4.00
345 2023-07-06 19:44 Vimaladitya Srinivasan Analysis

Meeting with TVS Azure team for implemention of Azure Data logging for eRIDEScan2W, RIDEScan3W & Mini VCI- Preparation of Scope document forTVS Ronin ISG Flashing Duration Optimization-DTC First Character Parse Logic change for BOSCH EMS

5.00
346 2023-07-04 09:08 Sithan Kumar Palanichamy Inter-team Meetings

Daily Scrum DOM Meetings for daily task activities

15.00