Project Details
Back to List
EOL - TVS BMW Chassis Roll
In-Progress
EOL - TVS BMW Chassis Roll

Reports

# Date Created Employee Work Type Task Duration (Hours) Action
1 2024-10-27 19:01 Pravin Lonkar Bug Fixing

Bug fixing support for Chassis roll station runtime and PLC communication issue resolution.

8.00
2 2024-10-27 18:55 Pravin Lonkar Bug Fixing

Bug fixing support for issue of BMW Chassis roll station Runtime application was not communicating with PLC.

8.00
3 2024-09-26 11:37 Pravin Lonkar Team Coordination / Technical Support

RTB Drive1 Station modifications for IMU routine run issue. Compared with Chassis Roll station and added delay and session as per Chassis roll station.

4.00
4 2024-07-08 04:38 Pravin Lonkar Project Documentation

Flow Chart preparation for Chassis roll station modifications to change ABS and Drive test Sequence.

4.00
5 2024-07-08 04:34 Pravin Lonkar Inter-team Meetings

inter team discussion on solution for ABS & Drive test sequence modification requirement from TVS. TVS Project list preparation. 

3.00
6 2024-06-12 15:46 Pravin Lonkar Bug Fixing

Testing done on bench for issue of less than or equal to logic failure in BMW chassis roll station.

4.00
7 2024-05-06 09:26 Tushar Shirish Dhakad Analysis

N597 Requirement Analysis and Feedback.N597 project test bench requirement analysis and inputs.

30.00
8 2024-04-21 17:19 Pravin Lonkar Analysis

IMU failure issue was reported by TVS team, Checked Logs & shared analysis with TVS team, Issue was getting negative response from ECU for Start IMU Routine. Follo up with Mallamma for Pending project payments.

8.00
9 2024-04-21 05:31 Pravin Lonkar Testing

Deployed modified binary on Production line and taken the trials on vehicles.

8.00
10 2024-04-21 05:27 Pravin Lonkar VAT Database

Simulated Date & Time Error in simulation and taken trials on bench, required modification done for resolving the issue. 

8.00
11 2024-04-21 05:24 Pravin Lonkar Testing

Monitored Date & time Error Issue on vehicles jointly with TVS team, Collected the logs and analyzed issue.

8.00
12 2024-04-21 05:21 Pravin Lonkar Analysis

Date & Time Error pop-up was getting in RTB Station intermittently, Checked Logs.

8.00
13 2024-04-21 03:02 Pravin Lonkar Testing

Testing of U400 ABS Station newly added SKU's.

7.00
14 2024-04-21 02:59 Pravin Lonkar Inter-team Meetings

VAT details Taken from TVS Laptop and Updated in Fogbugz for License renewal.

1.00
15 2024-04-21 02:45 Pravin Lonkar Testing

 Testing of U400 newly added SKU's.

7.00
16 2024-04-20 08:02 Pravin Lonkar Testing

Testing of U400 newly added SKU's,.

8.00
17 2024-04-20 07:36 Pravin Lonkar VAT Database

New SKU & Option MOD addition in TVS BMW RTB DB.

8.00
18 2024-04-20 07:34 Pravin Lonkar VAT Database

New SKU & Option MOD addition in TVS BMW RTB DB.

8.00
19 2024-04-20 07:13 Pravin Lonkar VAT Database

New SKU & Option MOD addition in TVS BMW RTB DB.

8.00
20 2024-04-19 08:37 Pravin Lonkar Testing

TVS BMW RTB Station Simulation setup

8.00
21 2024-04-19 08:18 Pravin Lonkar Testing

New Dongle Activation Status verification & Activation Request Fogbugz. RTB Simulation Setup for TVS.

8.00
22 2024-04-19 08:12 Pravin Lonkar Testing

New throttle test validation on Vehicle.

8.00
23 2024-04-19 08:06 Pravin Lonkar Testing

VAT training to new Jainee. Testing of new Runtime with TVS team.

8.00
24 2023-10-12 18:10 Tushar Shirish Dhakad Bug Fixing

RTB DB Upgradation and Validation

15.00
25 2023-06-09 13:13 Nikhil Km VAT Database

Priority-4Roller test bench tested data need to integrate report logiq. Required parameters details attached excel file please find out.>83 parameter logging in report logiq>TVS RTB online testing.>TVS testing bugs resolving.>Broadcast decode function decoding>Bypassed VIN scan in TVS with hard coded vin and SKU>Broadcast decode function decoding.>Bypassed VIN scan in TVS with hard coded vin and SKU

40.00